# BLACK BEAR MIDSTREAM LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-312368
- **title:** BLACK BEAR MIDSTREAM LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-03-22
- **effective on:** 2024-03-22
- **summary:** HAZARDOUS LIQUID in LA; INTERVAL; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312368-operator-38926.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312368-operator-38926.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312368-operator-38926
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Blackbear Midstream, LLC (the Company), a wholly owned subsidiary of Diversified Energy Company, LLC, is writing to the Division to request temporary relief from certain prescriptive obligations to comply with §195.452 Pipeline integrity management in high consequence areas. Specifically, the Company, is requesting an extension of two (2) time-based requirements to complete continuing reassessment of an identified high consequence area (HCA) area related to the Wildcat Pipeline located in Caddo Parish Louisianna. Please see that attached correspondence detailing the same. If at any time you require additional information or clarification, please feel free to contact me.
- **truncated:** false
- **body characters:** 678
