{"operation":"document","citation":"PHMSA 24-312418","title":"NUSTAR LOGISTICS, L.P. — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-06-07","effective_on":"2024-06-07","summary":"HAZARDOUS LIQUID in TX; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312418-operator-31454.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312418-operator-31454.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312418-operator-31454","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Update: the anomaly has now been remediated and the pressure reduction has been released as of June 18, 2024. This is a notification of a Long-Term Pressure Reduction under 49 CFR § 195.452 (h)(1)(ii). On June 9, 2023, NuStar Logistics, L.P. implemented a pressure reduction of 1126 psi on the Newport to Southlake 8” pipeline segment in response to one anomaly that was not remediated by its due date.","truncated":false,"body_characters":402}