# NUSTAR LOGISTICS, L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-312418
- **title:** NUSTAR LOGISTICS, L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-06-07
- **effective on:** 2024-06-07
- **summary:** HAZARDOUS LIQUID in TX; PRESSURE; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312418-operator-31454.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312418-operator-31454.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312418-operator-31454
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Update: the anomaly has now been remediated and the pressure reduction has been released as of June 18, 2024. This is a notification of a Long-Term Pressure Reduction under 49 CFR § 195.452 (h)(1)(ii). On June 9, 2023, NuStar Logistics, L.P. implemented a pressure reduction of 1126 psi on the Newport to Southlake 8” pipeline segment in response to one anomaly that was not remediated by its due date.
- **truncated:** false
- **body characters:** 402
