# LEE 8 STORAGE PARTNERSHIP — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-315505
- **title:** LEE 8 STORAGE PARTNERSHIP — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-07-25
- **effective on:** 2024-07-25
- **summary:** GAS TRANSMISSION in AL,AR,CT,FL,IL,IN,KS,KY,LA,MA,MI,MO,MS,NH,NJ,NY,OCSG,OH,OK,PA,RI,TN,TX,WV; ECA MECHANICAL DAMAGE EVALUATION; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-315505-operator-30786.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-315505-operator-30786.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-315505-operator-30786
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

OpIDs included in this Notification: 602, 5304, 12576, 15105, 18152, 19610, 19730, 32341, 32467, 32469, 39193, 40069, 15589, 18718, 26330, 30786, 32099 Energy Transfer Company (ET or Company) submits this written advance notification to PHMSA as directed by § 192.18 for use of an engineering critical assessment procedure to comply with the requirements of § 192.712(c). ET understands that it may proceed to utilize the enclosed procedure unless it receives a letter from the Associate Administrator for Pipeline Safety within in 90 days informing the Company that PHMSA objects to the proposal or that PHMSA requires additional time and/or more information to conduct its review.
- **truncated:** false
- **body characters:** 682
