{"operation":"document","citation":"PHMSA 24-315505","title":"ETC TIGER PIPELINE, LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-07-25","effective_on":"2024-07-25","summary":"GAS TRANSMISSION in AL,AR,CT,FL,IL,IN,KS,KY,LA,MA,MI,MO,MS,NH,NJ,NY,OCSG,OH,OK,PA,RI,TN,TX,WV; ECA MECHANICAL DAMAGE EVALUATION; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-315505-operator-32467.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-315505-operator-32467.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-315505-operator-32467","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"OpIDs included in this Notification: 602, 5304, 12576, 15105, 18152, 19610, 19730, 32341, 32467, 32469, 39193, 40069, 15589, 18718, 26330, 30786, 32099 Energy Transfer Company (ET or Company) submits this written advance notification to PHMSA as directed by § 192.18 for use of an engineering critical assessment procedure to comply with the requirements of § 192.712(c). ET understands that it may proceed to utilize the enclosed procedure unless it receives a letter from the Associate Administrator for Pipeline Safety within in 90 days informing the Company that PHMSA objects to the proposal or that PHMSA requires additional time and/or more information to conduct its review.","truncated":false,"body_characters":682}