# TRUNKLINE GAS CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-318146
- **title:** TRUNKLINE GAS CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-08-16
- **effective on:** 2024-08-16
- **summary:** GAS TRANSMISSION in TX; PRESSURE OUTSIDE HCA; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-318146-operator-19730.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-318146-operator-19730.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-318146-operator-19730
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Trunkline Gas Company (OPID 19730) submits this written notification to PHMSA as directed by § 192.714(e) for a pressure reduction that will exceed 365 days. Pipeline anomalies were reported via inline inspection on the Trunkline Premont - 100-1 system that required excavation but have not been evaluated and repaired to date. The current temporary pressure reduction will exceed 365 days on August 15th, 2024, with repairs anticipated to be completed prior to October 1st, 2024.
- **truncated:** false
- **body characters:** 480