# PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-321296
- **title:** PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-09-24
- **effective on:** 2024-09-24
- **summary:** GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-321296-operator-15007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-321296-operator-15007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-321296-operator-15007
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pacific Gas and Electric Company has performed MAOP reconfirmation via 192.624 (c)(6) Alternative Technology of the joints at its Vallejo Station to reconfirm Maximum Allowable Operating Pressure (MAOP). This station is in Vallejo, California and provides regulated gas to the Benicia area. PG& E's initial phase of this project identified all (TVC) records to validate MAOP based on design and pressure test records. At this station pressure test records of twelve (12) joints are not TVC. These joints are located in a Moderate Consequence Area (MCA). They are located in a Class 3 location. PG &E proposes to reconfirm MAOP via Section 192.624 (c)(6).
- **truncated:** false
- **body characters:** 654