{"operation":"document","citation":"PHMSA 24-323144","title":"PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-09-24","effective_on":"2024-09-24","summary":"HAZARDOUS LIQUID in VA; RMV OPERATIONAL DELAY; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-323144-operator-15674.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-323144-operator-15674.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-323144-operator-15674","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 49 CFR Part 195.418 and 195.18, please see the attached request to extend the 14-day operation requirement of a rupture mitigation valve for Product SE Pipe Line’s 6WN Line near Alexandria, VA","truncated":false,"body_characters":211}