# PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-323144
- **title:** PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-09-24
- **effective on:** 2024-09-24
- **summary:** HAZARDOUS LIQUID in VA; RMV OPERATIONAL DELAY; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-323144-operator-15674.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-323144-operator-15674.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-323144-operator-15674
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR Part 195.418 and 195.18, please see the attached request to extend the 14-day operation requirement of a rupture mitigation valve for Product SE Pipe Line’s 6WN Line near Alexandria, VA
- **truncated:** false
- **body characters:** 211
