{"operation":"document","citation":"PHMSA 24-326441","title":"PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-11-19","effective_on":"2024-11-19","summary":"GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-326441-operator-15007.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-326441-operator-15007.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-326441-operator-15007","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pacific Gas and Electric Company has performed MAOP reconfirmation via 192.624 (c)(6) Alternative Technology of the joints at its Gilroy King City Meter Station to reconfirm Maximum Allowable Operating Pressure.","truncated":false,"body_characters":211}