# PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-326441
- **title:** PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-11-19
- **effective on:** 2024-11-19
- **summary:** GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-326441-operator-15007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-326441-operator-15007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-326441-operator-15007
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pacific Gas and Electric Company has performed MAOP reconfirmation via 192.624 (c)(6) Alternative Technology of the joints at its Gilroy King City Meter Station to reconfirm Maximum Allowable Operating Pressure.
- **truncated:** false
- **body characters:** 211
