# SOUTH BOW INFRASTRUCTURE OPERATIONS INC. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-327526
- **title:** SOUTH BOW INFRASTRUCTURE OPERATIONS INC. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2024-11-22
- **effective on:** 2024-11-22
- **summary:** HAZARDOUS LIQUID in IL,MO; DISCOVERY BEYOND 180 DAYS HCA; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-327526-operator-32334.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-327526-operator-32334.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-327526-operator-32334
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

South Bow Infrastructure Operations Inc. (OPID 32334) would like to inform you that following receipt of an ILI report for a metal-loss/geometry inspection completed on KS9 (Missouri, Illinois), on May 26, 2024, the reported geometry data may have associated sizing challenges with a bias towards under-sizing. Consequently, and to no fault of South Bow, discovery of a condition relevant to the geometry data of this inspection may exceed the 180-day threshold, in the event that potential under-sizing of the geometry feature depth is of relevance to the response condition, which is the purpose of this notification in accordance with CFR Part 195.452(h)(2). Note that the metal-loss data of this inspection is not affected and will be responded to within the 180-day threshold (i.e., by Nov 22, 2024), in accordance with CFR Part 195.452(h)(2). South Bow continues to respond to the as-reported geometry feature population in accordance with regulatory requirements.
- **truncated:** false
- **body characters:** 970
