{"operation":"document","citation":"PHMSA 24-328411","title":"WISCONSIN GAS LLC DBA WE ENERGIES — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-12-19","effective_on":"2024-12-19","summary":"GAS TRANSMISSION in WI; REASSESSMENT INTERVAL BELOW 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-328411-operator-22763.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-328411-operator-22763.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-328411-operator-22763","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Wisconsin Gas Company, LLC (dba We Energies) is requesting a 6-month extension per 192.939(b) for a 7 calendar year reassessment interval by submission of this email. An ECDA scheduled in 2024 has been delayed due to unforeseen excavation permit issues for the direct examination portion of the assessment. The permit for a required excavation was applied for on August 30, 2024 with a 60day maximum expectation for issuance. Upon follow-up, Wisconsin Gas was informed that the excavation location was within the bounds of a cemetery and that the permitting authority needed to provide a 30 day commentary period notice to the cemetery’s registry of interested persons. It was anticipated that permit issuance would occur immediately after this 30 day period, allowing for excavation during the week of December 16, 2024; however, an individual requested a hearing on the matter. The permitting authority is currently consulting legal counsel on next steps and it is no longer possible to complete the excavation before the end of 2024. Wisconsin Gas will complete the required excavation as soon as practical after obtaining the permit in 2025.","truncated":false,"body_characters":1145}