# EL PASO NATURAL GAS CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-329451
- **title:** EL PASO NATURAL GAS CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-12-26
- **effective on:** 2024-12-26
- **summary:** GAS TRANSMISSION in AZ; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-329451-operator-4280.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-329451-operator-4280.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-329451-operator-4280
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pursuant to 49 C.F.R. §192.939(a) and §192.18, El Paso Natural Gas Company (EPNG), OPID 4280, requests an extension of the 7-calendar year reassessment interval for the pipeline segment noted below. The compliance date is 12/31/2024, and EPNG is requesting an extension to 5/1/2025. The assessment methodology for this pipeline segment is a pressure test, and there have been three hydrostatic pressure test failures on this segment in 2024. The first occurred on 10/12/2024, the second on 11/14/2024, and the third on 12/23/2024. Causes of the failures are being investigated and the pipeline segment will remain out of service until successfully hydrotested by the requested extended deadline of 5/1/2025.
- **truncated:** false
- **body characters:** 707
