{"operation":"document","citation":"PHMSA 25-329780","title":"SAN DIEGO GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-12-31","effective_on":"2024-12-31","summary":"GAS TRANSMISSION in CA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-329780-operator-18112.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-329780-operator-18112.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-329780-operator-18112","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"As required by 49 CFR §190.343, Information made available to the public and request for protection of confidential commercial information, please find attached: Confidentiality marked versions and redacted versions of: 6-Month Assessment Extension_SDGE_L2010 6-Month Assessment Extension_SDGE_L3600 6-Month Assessment Extension_SDGE_L49-23","truncated":false,"body_characters":340}