{"operation":"document","citation":"PHMSA 25-332958","title":"LOS ANGELES WATER & POWER — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-02-04","effective_on":"2025-02-04","summary":"GAS TRANSMISSION in CA; PROGRAM; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-332958-operator-40005.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-332958-operator-40005.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-332958-operator-40005","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In compliance with the notification requirements of 49 CFR 192.909(b), I am submitting notification that there has been a change to the LADWP Integrity Management Program. The change is as follows: • A new IMP program manual was developed. The effective date of the manual is January 22, 2025. The following information applies to this notification: • OPID – 40005 • Operator Name: LOS ANGELES WATER & POWER","truncated":false,"body_characters":407}