# LOS ANGELES WATER & POWER — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-332958
- **title:** LOS ANGELES WATER & POWER — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-02-04
- **effective on:** 2025-02-04
- **summary:** GAS TRANSMISSION in CA; PROGRAM; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-332958-operator-40005.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-332958-operator-40005.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-332958-operator-40005
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In compliance with the notification requirements of 49 CFR 192.909(b), I am submitting notification that there has been a change to the LADWP Integrity Management Program. The change is as follows: • A new IMP program manual was developed. The effective date of the manual is January 22, 2025. The following information applies to this notification: • OPID – 40005 • Operator Name: LOS ANGELES WATER & POWER
- **truncated:** false
- **body characters:** 407
