{"operation":"document","citation":"PHMSA 25-336634","title":"RAVEN BUTENE-1, LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-03-14","effective_on":"2025-03-14","summary":"HAZARDOUS LIQUID in TX; INTERVAL; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-336634-operator-39942.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-336634-operator-39942.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-336634-operator-39942","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Raven Butene - 1, LLC (\"Raven\") is notifying PHMSA that Raven will not complete required pipeline reassessments within 68 month period per 49 C.F.R. Section 195.452 (j)(3). This notification is Raven's \" Ethane Pipeline and 4\" Butene-1 Pipeline. The 68 month reassessment interval ends March 17, 2025.","truncated":false,"body_characters":301}