# RAVEN BUTENE-1, LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-336634
- **title:** RAVEN BUTENE-1, LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-03-14
- **effective on:** 2025-03-14
- **summary:** HAZARDOUS LIQUID in TX; INTERVAL; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-336634-operator-39942.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-336634-operator-39942.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-336634-operator-39942
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Raven Butene - 1, LLC ("Raven") is notifying PHMSA that Raven will not complete required pipeline reassessments within 68 month period per 49 C.F.R. Section 195.452 (j)(3). This notification is Raven's " Ethane Pipeline and 4" Butene-1 Pipeline. The 68 month reassessment interval ends March 17, 2025.
- **truncated:** false
- **body characters:** 301
