{"operation":"document","citation":"PHMSA 25-337358","title":"TICONA POLYMERS INC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-03-27","effective_on":"2025-03-27","summary":"GAS TRANSMISSION in TX; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-337358-operator-31372.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-337358-operator-31372.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-337358-operator-31372","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Ticona Polymers, Inc. (\"Ticona\") is requesting a six-month reassessment extension per the requirements of 49 CFR Section 192.939 (a). The extension request is for Ticona's King Ranch Natural Gas System, Pipeline ID Suth Loop (\"Pipeline\"). The seven-year reassessment interval date is May 4, 2025. Ticona requests a new reassessment date of November 4, 2025.","truncated":false,"body_characters":357}