# TICONA POLYMERS INC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-337358
- **title:** TICONA POLYMERS INC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-03-27
- **effective on:** 2025-03-27
- **summary:** GAS TRANSMISSION in TX; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-337358-operator-31372.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-337358-operator-31372.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-337358-operator-31372
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Ticona Polymers, Inc. ("Ticona") is requesting a six-month reassessment extension per the requirements of 49 CFR Section 192.939 (a). The extension request is for Ticona's King Ranch Natural Gas System, Pipeline ID Suth Loop ("Pipeline"). The seven-year reassessment interval date is May 4, 2025. Ticona requests a new reassessment date of November 4, 2025.
- **truncated:** false
- **body characters:** 357
