# INEOS USA LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-340060
- **title:** INEOS USA LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-04-15
- **effective on:** 2025-04-15
- **summary:** HAZARDOUS LIQUID in TX; TECHNOLOGY; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-340060-operator-39398.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-340060-operator-39398.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-340060-operator-39398
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR 195.452(j) and (m), INEOS USA, LLC (hereinafter “INEOS”) is submitting an Other Technology notification for its pipeline segment INS-PRNW, which is a 0.01-mile lateral located in Harris County, Texas. Consistent with the requirements of § 195.452(j)(5)(iv), INEOS is providing this notification at least 90 days prior to the planned assessment date of August 18, 2025. The following provides a description of the subject pipeline segment, associated integrity threats, and how the use of other technology will provide an equivalent understanding of the pipeline’s condition.
- **truncated:** false
- **body characters:** 600
