{"operation":"document","citation":"PHMSA 25-342209","title":"PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-05-19","effective_on":"2025-05-19","summary":"GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-342209-operator-15007.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-342209-operator-15007.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-342209-operator-15007","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pacific Gas and Electric Company (PG&E) has performed MAOP reconfirmation via § 192.624(c)(6) Alternative Technology of the joints at its California Street Regulator Station (California St Station) to reconfirm Maximum Allowable Operating Pressure (MAOP). This station is in Salinas, California and provides regulated gas to downtown Salinas and Harkins Road Regulator Station. PG&E’s initial phase of this project identified all traceable, verifiable, and complete (TVC) records to validate MAOP based on design and pressure test records. At this station pressure test records of twelve (12) joints are not TVC. These joints are located in a High Consequence Area (HCA). They are located in a Class 3 location.","truncated":false,"body_characters":711}