{"operation":"document","citation":"PHMSA 25-344498","title":"PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-06-13","effective_on":"2025-06-13","summary":"GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-344498-operator-15007.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-344498-operator-15007.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-344498-operator-15007","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pacific Gas and Electric Company (PG&E) has performed MAOP reconfirmation via § 192.624(c)(6) Alternative Technology of the joints at its Miner & D Station to reconfirm Maximum Allowable Operating Pressure (MAOP). This station is in Stockton, California and provides regulated gas to Stockton area. PG&E’s initial phase of this project identified all traceable, verifiable, and complete (TVC) records to validate MAOP based on design and pressure test records. At this station pressure test records of six (6) joints are not TVC. These joints are located in a Moderate Consequence Area (MCA). They are located in a Class 3 location.","truncated":false,"body_characters":632}