{"operation":"document","citation":"PHMSA 25-345723","title":"SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-06-20","effective_on":"2025-06-20","summary":"GAS TRANSMISSION in CA; WELDED COMPONENT TEMPORARY; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-345723-operator-18484.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-345723-operator-18484.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-345723-operator-18484","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with Title 49 CFR Section 192.153 (e)(4)(ii), this letter is to notify you of SoCalGas' L-2001W/2002/2003 P6 In-Line Inspection (ILI) project in the Los Angeles region, and temporary pre-fabricated units to be in place for longer than 30 days.","truncated":false,"body_characters":257}