{"operation":"document","citation":"PHMSA 25-347039","title":"SAN DIEGO GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2025-07-03","effective_on":"2025-07-03","summary":"GAS TRANSMISSION in CA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: UNDER REVIEW.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-347039-operator-18112.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-347039-operator-18112.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-347039-operator-18112","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Please find the attached extension request letter, and accompanying documentation, in accordance with 49 CFR § 192.939(a). There are 4 separate attachments. As required by 49 CFR §190.343, Information made available to the public and request for protection of confidential commercial information, please find attached: • Confidentiality marked versions and redacted versions of: ¿ SDG&E 6-Month Assessment Extension.pdf • “Confidentiality Declaration SDGE 6-Month Assessment Extensions.pdf”, for CPUC treatment of confidential information • “PHMSA FOIA - SDGE 6-month Assessment Extension Request.pdf”, explanation of our request for confidential treatment of these documents at a federal level","truncated":false,"body_characters":694}