# SAN DIEGO GAS & ELECTRIC CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-347039
- **title:** SAN DIEGO GAS & ELECTRIC CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2025-07-03
- **effective on:** 2025-07-03
- **summary:** GAS TRANSMISSION in CA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-347039-operator-18112.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-347039-operator-18112.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-347039-operator-18112
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Please find the attached extension request letter, and accompanying documentation, in accordance with 49 CFR § 192.939(a). There are 4 separate attachments. As required by 49 CFR §190.343, Information made available to the public and request for protection of confidential commercial information, please find attached: • Confidentiality marked versions and redacted versions of: ¿ SDG&E 6-Month Assessment Extension.pdf • “Confidentiality Declaration SDGE 6-Month Assessment Extensions.pdf”, for CPUC treatment of confidential information • “PHMSA FOIA - SDGE 6-month Assessment Extension Request.pdf”, explanation of our request for confidential treatment of these documents at a federal level
- **truncated:** false
- **body characters:** 694
