{"operation":"document","citation":"PHMSA 25-351056","title":"PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-08-20","effective_on":"2025-08-20","summary":"HAZARDOUS LIQUID in NC,VA; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-351056-operator-15674.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-351056-operator-15674.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-351056-operator-15674","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 49 CFR 195.452(h)(1)(ii), pipeline operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365- days and requires operators to provide the reason for the delays. Attached is the notification for Products (SE) Pipe Line Corporation’s 14W 14 inch Greensboro to Richmond Junction pipeline.","truncated":false,"body_characters":376}