# PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-351056
- **title:** PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-08-20
- **effective on:** 2025-08-20
- **summary:** HAZARDOUS LIQUID in NC,VA; PRESSURE; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-351056-operator-15674.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-351056-operator-15674.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-351056-operator-15674
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR 195.452(h)(1)(ii), pipeline operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365- days and requires operators to provide the reason for the delays. Attached is the notification for Products (SE) Pipe Line Corporation’s 14W 14 inch Greensboro to Richmond Junction pipeline.
- **truncated:** false
- **body characters:** 376
