{"operation":"document","citation":"PHMSA 25-354153","title":"WOODWAY BLUEBONNET PIPELINE LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-09-30","effective_on":"2025-09-30","summary":"GAS TRANSMISSION in TX; PROGRAM; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354153-operator-39755.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354153-operator-39755.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354153-operator-39755","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"OpID 39375 WOODWAY TEXAS PIPELINE LLC OpID 39755 WOODWAY BLUEBONNET PIPELINE LLC In 2025, Woodway Holdings, the parent company of Woodway Bluebonnet Pipeline and Woodway Texas Pipeline, collectively \"Woodway\", implemented a major enhancement to its pipeline information management processes through the deployment of a new geodatabase designed for data analysis and records retention. This advancement in data collection and integration enabled Woodway to transition from a Subject Matter Expert (SME)-based risk assessment approach to a structured semi-quantitative methodology. In accordance with 49 CFR §192.909(b), this letter serves to notify PHMSA and the Railroad Commission of Texas (RRC-TX) that a significant change has been made to our data management and risk assessment practices and fully adopted into our Integrity Management Program (IMP) in September 2025.","truncated":false,"body_characters":873}