# WOODWAY BLUEBONNET PIPELINE LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-354153
- **title:** WOODWAY BLUEBONNET PIPELINE LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-09-30
- **effective on:** 2025-09-30
- **summary:** GAS TRANSMISSION in TX; PROGRAM; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354153-operator-39755.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354153-operator-39755.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354153-operator-39755
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

OpID 39375 WOODWAY TEXAS PIPELINE LLC OpID 39755 WOODWAY BLUEBONNET PIPELINE LLC In 2025, Woodway Holdings, the parent company of Woodway Bluebonnet Pipeline and Woodway Texas Pipeline, collectively "Woodway", implemented a major enhancement to its pipeline information management processes through the deployment of a new geodatabase designed for data analysis and records retention. This advancement in data collection and integration enabled Woodway to transition from a Subject Matter Expert (SME)-based risk assessment approach to a structured semi-quantitative methodology. In accordance with 49 CFR §192.909(b), this letter serves to notify PHMSA and the Railroad Commission of Texas (RRC-TX) that a significant change has been made to our data management and risk assessment practices and fully adopted into our Integrity Management Program (IMP) in September 2025.
- **truncated:** false
- **body characters:** 873
