{"operation":"document","citation":"PHMSA 25-354207","title":"ENTERPRISE PRODUCTS OPERATING LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2025-09-30","effective_on":"2025-09-30","summary":"HAZARDOUS LIQUID in IA,KS,MO; PRESSURE; PHMSA status: OBJECTIONS RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354207-operator-31618.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354207-operator-31618.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-25-354207-operator-31618","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"A 20% temporary pressure reduction was first implemented on August 30, 2024 following the receipt of inline inspection results. In accordance with 49 CFR 195.452(h)(1 )(ii) Enterprise has performed cutouts and replacements for some of the features identified in the inline tool inspection. Rehab is still in progress and remedial action are still be reviewed and assessed to ensure the pipeline is being safely operated. The remaining anomalies are being maintained under the 20% pressure reduction set point.","truncated":false,"body_characters":509}