# PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-359805
- **title:** PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-12-09
- **effective on:** 2025-12-09
- **summary:** GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-359805-operator-15007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-359805-operator-15007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-359805-operator-15007
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pacific Gas and Electric Company (PG & E) has performed MAOP reconfirmation vis Section 192.624 (c)(6) Alternative Technology of the joints as its Arata and Baldwin District Regulator Station (Arata and Baldwin Station) to reconfirm Maximum Allowable Operating Pressure (MAOP). - See attached docs for details
- **truncated:** false
- **body characters:** 309
