# PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 25-359814
- **title:** PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-12-08
- **effective on:** 2025-12-08
- **summary:** GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-359814-operator-15007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-359814-operator-15007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-25-359814-operator-15007
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pacific Gas and Electric Company (PG&E) has performed MAOP reconfirmation via Section 192.624 (c)(6) Alternative Technology of the joints at its E. &J. Gallo Winery, Fresno Meter & Regulatory Station (EJ Gallo Olive Station) to reconfirm Maximum Allowable Operating Pressure (MAOP). This station is in Fresno, California and provides regulated gas to E. & J. Gallo Winery. PG & E's initial phase of this project identified all traceable, verifiable, and complete (TVC) records to validate MAOP based on design and pressure test records. At this station pressure test records of three (3) joints are not TVC. These joints are located in a Moderate Consequence Area (MCA). They are located in a Class 3 location.
- **truncated:** false
- **body characters:** 710
