# TEXAS GAS TRANSMISSION, LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 26-363970
- **title:** TEXAS GAS TRANSMISSION, LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2026-02-04
- **effective on:** 2026-02-04
- **summary:** GAS TRANSMISSION in MS; RMV OPERATIONAL DELAY; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-363970-operator-19270.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-363970-operator-19270.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-363970-operator-19270
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR §§ 192.18 and 192.634(a), Texas Gas Transmission, LLC (Texas Gas) (OPID 19270) is hereby requesting an extension of the 14-day operational requirement for rupture-mitigation valve (RMV) activation on its pipeline known as XAI 24-1 at milepost 0+0000. XAI 24-1 is a lateral of Texas Gas’s Main Line System at milepost 239+0731 in DeSoto County, MS.
- **truncated:** false
- **body characters:** 373
