# FLORIDA GAS TRANSMISSION CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 26-366146
- **title:** FLORIDA GAS TRANSMISSION CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2026-02-26
- **effective on:** 2026-02-26
- **summary:** GAS TRANSMISSION in FL; PRESSURE OUTSIDE HCA; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-366146-operator-5304.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-366146-operator-5304.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-366146-operator-5304
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Florida Gas Transmission Company (OPID 5304) submits this written notification to PHMSA as directed by§ 192.714(e)(iii)(3) for a pressure reduction that will exceed 365 days. The cm1·ent temporary pressure reduction will exceed 365 days on March 5, 2026. This pressure reduction extension only affects valve section 18-3 for two response conditions.
- **truncated:** false
- **body characters:** 349
