# GOLDEN PASS PIPELINE LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 26-366784
- **title:** GOLDEN PASS PIPELINE LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2026-03-06
- **effective on:** 2026-03-06
- **summary:** GAS TRANSMISSION in TX; ILI RESULTS EXTENSION; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-366784-operator-40763.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-366784-operator-40763.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-366784-operator-40763
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pursuant to 49 CFR Section 192.933(b), Golden Pass Pipeline LLC (GPPL) is providing notification regarding a delay in the discovery determination of indications during an In-Line inspection (ILI) run.
- **truncated:** false
- **body characters:** 200
