{"operation":"document","citation":"PHMSA 26-373485","title":"SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2026-05-21","effective_on":"2026-05-21","summary":"GAS TRANSMISSION in CA; ILI RESULTS EXTENSION; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-26-373485-operator-18484.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-26-373485-operator-18484.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-26-373485-operator-18484","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 49 CFR 192.933(b), Southern California Gas Company (SoCalGas) is notifying the Pipeline and Hazardous Material Safety Administration (PHMSA) of the inability to complete discovery of an Immediate Repair Condition (IRC) within the 180-day period following receipt of the final report of an electromagnetic acoustic transducer (EMAT) in-line inspection (ILI) for Pipeline 1015.","truncated":false,"body_characters":394}