# SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 26-373485
- **title:** SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2026-05-21
- **effective on:** 2026-05-21
- **summary:** GAS TRANSMISSION in CA; ILI RESULTS EXTENSION; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-373485-operator-18484.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-373485-operator-18484.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-26-373485-operator-18484
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR 192.933(b), Southern California Gas Company (SoCalGas) is notifying the Pipeline and Hazardous Material Safety Administration (PHMSA) of the inability to complete discovery of an Immediate Repair Condition (IRC) within the 180-day period following receipt of the final report of an electromagnetic acoustic transducer (EMAT) in-line inspection (ILI) for Pipeline 1015.
- **truncated:** false
- **body characters:** 394
