# ENABLE GAS TRANSMISSION, LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA GT - 395
- **title:** ENABLE GAS TRANSMISSION, LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-07-03
- **effective on:** 2018-07-03
- **summary:** GAS TRANSMISSION in OK, IL; REPAIR; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-gt-395-operator-602.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-gt-395-operator-602.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-gt-395-operator-602
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

180- Day Delay EMRT and Enable Gas Transmission, LLC request waivers for reassessment intervals under Section 192.943 (a). The reassessment for the single HCA on EMRT's IGTALTON line and three HCAs on EGT's Line A-3 may not be accomplished by the end of the required reassessment timeframe (December 31, 2018). As the 190-day prior notification requirement ex
- **truncated:** false
- **body characters:** 359
