{"operation":"document","citation":"PHMSA GT - 400","title":"CITY OF VERNON — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-01-30","effective_on":"2019-01-30","summary":"GAS TRANSMISSION in CA; TECHNOLOGY; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-gt-400-operator-31955.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-gt-400-operator-31955.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-gt-400-operator-31955","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Other Technology Pursuant to CFR 49 §192.937(c)(4), this letter serves as notice of the City of Vernon’s intent to repeat the use of Guided Wave Ultrasonic (GUL) Technology, a designated “other technology” for the continual process of evaluation and assessment of the City of Vernon’s (COV) gas transmission pipeline.","truncated":false,"body_characters":317}