{"operation":"document","citation":"PHMSA HL - 16","title":"CHEVRON PIPE LINE CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2003-03-25","effective_on":"2003-03-25","summary":"HAZARDOUS LIQUID in LA; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-16-operator-2731.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-16-operator-2731.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-16-operator-2731","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Repairs delayed one year due to permitting and severe storms 36 anomalies meeting repair criteria in 195.452(h) found by ILI on three parallel pipelines (12-inch and 2 6-inch). MOP reduced 17 percent. Repairs delayed, initially by permitting and then by Tropical Storms and Hurricane Lili. Storm delay resulted in need to re-permit. 20 percent reduction in operating pressure taken when 365-day limit expired on first pressure reduction.","truncated":false,"body_characters":437}