# SUNOCO PIPELINE L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA HL - 616
- **title:** SUNOCO PIPELINE L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-02-09
- **effective on:** 2018-02-09
- **summary:** HAZARDOUS LIQUID in LA, MI, NM, OH, OK, PA, TX; REPAIR; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-616-operator-18718.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-616-operator-18718.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-616-operator-18718
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

60-Day Repair Delay Sunoco Pipeline L.P. (OPID 18718) is submitting an IMP notification per 195.452(h)(1)(i) for the Goodrich to OTI 10” (21004.4) interstate crude oil pipeline. One (1) 60-day condition will not be remediated according to schedule on the Goodrich to OTI 10” pipeline segment. A topside dent >0.250” (NPS < 12”) with no metal loss was discovered on December 13, 2017 via ILI analysis
- **truncated:** false
- **body characters:** 399
