{"operation":"document","citation":"PHMSA HL - 655","title":"NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-04-12","effective_on":"2019-04-12","summary":"HAZARDOUS LIQUID in IA; INTERVAL; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-655-operator-10012.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-655-operator-10012.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-655-operator-10012","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Interval - Extended Assessment Deadline The assessment interval defined in 49 CFR 195.452 (j)(3) will be exceeded due to multiple tool run failures. An MFL tool was successfully completed on 03/28/19. A geometry tool run was completed on 09/28/18 resulting in 79% sensor coverage. See \"Other Info\" section below for full timeline of attempted assessments.","truncated":false,"body_characters":355}