# NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA HL - 655
- **title:** NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-04-12
- **effective on:** 2019-04-12
- **summary:** HAZARDOUS LIQUID in IA; INTERVAL; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-655-operator-10012.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-655-operator-10012.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-hl-655-operator-10012
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Interval - Extended Assessment Deadline The assessment interval defined in 49 CFR 195.452 (j)(3) will be exceeded due to multiple tool run failures. An MFL tool was successfully completed on 03/28/19. A geometry tool run was completed on 09/28/18 resulting in 79% sensor coverage. See "Other Info" section below for full timeline of attempted assessments.
- **truncated:** false
- **body characters:** 355
