# KB Cascade Pipeline — Pipeline Special Permit

- **operation:** document
- **citation:** PHMSA-2008-0140
- **title:** KB Cascade Pipeline — Pipeline Special Permit
- **source type:** permit
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2009-02-27
- **effective on:** 2009-02-27
- **summary:** PHMSA-2008-0140, issued 2009-02-27 for KB Cascade Pipeline's gas transmission system.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0140.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0140.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0140
- **source url:** https://www.regulations.gov/docket/PHMSA-2008-0140
**body:**

PHMSA pipeline special permit PHMSA-2008-0140. Operator: KB Cascade Pipeline. System: Gas Transmission. Issue date: 2009-02-27.
- **truncated:** false
- **body characters:** 127
