# Southern LNG — Pipeline Special Permit

- **operation:** document
- **citation:** PHMSA-2008-0143
- **title:** Southern LNG — Pipeline Special Permit
- **source type:** permit
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2009-01-08
- **effective on:** 2009-01-08
- **summary:** PHMSA-2008-0143, issued 2009-01-08 for Southern LNG's lng system.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0143.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0143.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0143
- **source url:** https://www.regulations.gov/docket/PHMSA-2008-0143
**body:**

PHMSA pipeline special permit PHMSA-2008-0143. Operator: Southern LNG. System: LNG. Issue date: 2009-01-08.

<<<PAGE 1>>>

......
1
U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION (PHMSA)
Special Permit Analysis and Findings
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) provides this document
to describe the relevant facts of the special permit request outlined below, to discuss any public
comments received regarding the special permit request, to present the safety analysis
accomplished with regards to the special permit request, and to list the findings of that analysis.
This document is used to justify the grant of a special permit to Southern LNG, Inc. (SLNG) for
the Elba Island III Terminal Expansion Project, Elba Island, Savannah, Georgia, waiving
compliance from the Federal pipeline safety regulations in 49 CFR § 193.2301.
Special Permit Information:
Docket Number:
PHMSA-2008-0143
Pipeline Operator:
Southern LNG, Inc.
Date Requested:
Apnl 28, 2008
Code Section(s):
49 CFR § 193.2301
System Affected: This special permit request pertains to the Southern LNG, Inc. (SLNG), Elba
Island III Terminal Expansion Project, Elba Island, Savannah, Georgia
Special Permit Request
On April 28, 2008, SLNG requested a waiver of compliance from the Federal pipeline safety
regulations in 49 CFR § 193.2301 for a 1.25 million barrel (nominal) liquefied natural gas
(LNG) storage tank at its LNG import terminal at Elba Island, Savannah, Georgia. The tank is
being constructed as part of the Elba Island III Terminal Expansion Project. The existing
regulations in § 193.2301 require LNG tank welds to undergo radiographic examination. SLNG
proposes instead to use ultrasonic examination (UT). According to SLNG, the examination
would consist "of full semi-automated and manual UT examination using shear wave probes and
a volumetric UT examination using a combination of creep wave (CW) probes and focused
angled longitudinal wave (ALW) probes."

<<<PAGE 2>>>

2
Public Notice:
On June 23, 2008, PHMSA posted a notice of this special permit request in the Federal Register
(73 FR 35437). We did not receive any comments for or against this special permit request as a
result of this notice. The request letter, Federal Register notice and all other pertinent documents
are available for review in Docket No. PHMSA-2008-0143 in the Federal Docket Management
System (FDMS) located on the Internet at www.Regulations.gov.
Analysis:
The Federal pipeline safety regulations require each LNG facility constructed after March 31,
2000, to comply with 49 CFR Part 193 and the National Fire Protection Association's Standard
59A (NFPA 59A), 2001 Edition. The NFPA 59A, 2001 Edition requires that welded LNG
containers designed for not more than 15 pounds per square inch gauge (psig) comply with the
Eighth Edition, 1990, of American Petroleum Institute Standard 620 (API 620), "Design and
Construction of Large, Welded, Low-Pressure Storage Tanks (Appendix Q). " The Eighth Edition
of API 620, in turn, calls for the full radiographic examination of all vertical and horizontal butt
welds associated with the container.
The NFPA issued a Tentative Interim Amendment to the NFPA 59A, 2006 Edition, effective
February 14, 2006 (59A TIA06). The amendment incorporates API 620, Tenth Edition, 2002,
Addendum 1, 2004, which adds ultrasonic examination (UT) as an acceptable non-destructive
testing method for LNG storage tank welds. The addendum states, "the term
'examination'.. shall be understood to refer to radiographic or ultrasonic examination."
Findings:
PHMSA finds that granting this special permit to SLNG to use UT to non-destructively test the
welds on a newly constructed LNG storage tank at the Elba Island Terminal, Savannah, Georgia,
is not inconsistent with pipeline safety. Doing so will provide a level of safety equal to, or
greater than, that which would be provided if the welds were examined using the radiographic
examination as currently required by the pipeline regulations in 49 CFR § 193.2301.
We do so because the special permit analysis shows the following:

<<<PAGE 3>>>

3
1. Both the API and the NFPA have approved ultrasonic testing as an acceptable method to
non-destructively test welds on LNG storage tanks.
2. SLNG will complete the non-destructive weld testing in accordance with API 620, 10th
Edition, February 2002, Addendum 1, Appendix U, June 2004.
JAN 0 8 2009
Completed in Washington DC on:

<<<PAGE 1>>>

of Transportation
U.S. Department
Washington, D.C. 20590
1200 New Jersey Avenue, SE
Pipeline and Hazardous
Materials Safety
Administration
JAN
8 2009
Mr. Patrick F. Carey, P.E.
El Paso Pipeline Group
1001 Louisiana Street
Houston, TX 77252-2511
Docket No. PHMSA-2008-0143
Dear Mr. Carey:
On April 28, 2008, you wrote to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) on behalf of Southern LNG, Inc. (SLNG) requesting a special permit to waive
compliance from PHMSA's pipeline safety regulation 49 CFR § 193.2301 for the Elba Island III
Terminal Expansion Project, Elba Island, Savannah, Georgia. The regulation requires the use of
radiography to examine the welds on liquefied natural gas (LNG) storage tanks.
PHMSA is granting this special permit (enclosed) to SLNG. The special permit allows SLNG to
use ultrasonic testing (UT) to non-destructively test the welds on a newly constructed ING
storage tank at the Elba Island Terminal. This special permit has conditions and limitations and
provides some relief from the Federal pipeline safety regulations for SLNG while ensuring that
pipeline safety is not compromised.
My staff would be pleased to discuss this special permit or any other regulatory matter with you.
John Gale, Director of Regulations (202-366-0434), may be contacted on regulatory matters and
contacted on technical matters specific to this special permit.
Alan Mayberry, Director of Engineering and Emergency Support (202-366-5124), may be
Sincerely,
Martial y
fer:
Jeffrey D. Wiese
Associate Administrator for Pipeline Safety
Enclosure: Special Permit
...