# Empire Pipeline Company — Pipeline Special Permit

- **operation:** document
- **citation:** PHMSA-2008-0213
- **title:** Empire Pipeline Company — Pipeline Special Permit
- **source type:** permit
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2020-04-24
- **effective on:** 2020-04-24
- **summary:** PHMSA-2008-0213, issued 2020-04-24 for Empire Pipeline Company's gas transmission system.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0213.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0213.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2008-0213
- **source url:** https://www.regulations.gov/docket/PHMSA-2008-0213
**body:**

PHMSA pipeline special permit PHMSA-2008-0213. Operator: Empire Pipeline Company. System: Gas Transmission. Issue date: 2020-04-24.

<<<PAGE 1>>>

u.s. Department
of Transportation
Pipeline and Hazardous Materials
Safety Administration
Mr. Ronald C. Kraemer
President
Empire Pipeline, Inc.
6363 Main Street
Williamsville, NY 14221-5887
1200 New Jersey Ave., SE
Washington, DC 20590
MAY 2·t 2010
Docket No. PHMSA-2008-0213
Dear Mr. Kraemer:
On August 8, 2008, Empire Pipeline, Inc. (Empire) wrote to the Pipeline and Hazardous
Materials Safety Administration (PHMSA), as operator of Empire State Pipeline, requesting a
waiver of compliance from PHMSA's pipeline safety regulation 49 CFR § 192.611(a) for five
(5) segments on the Empire State Pipeline 24-inch natural gas transmission pipeline system in
Niagara, Genesee, and Monroe Counties, New York. The regulation requires confirmation or
revision of the maximum allowable operating pressure (MAOP) of a pipeline segment where the
class location has changed.
PHMSA is granting this special permit ( enclosure), which allows Empire to continue to operate
the five (5) segments ofthe Empire State Pipeline at their current MAOP of 1440 pounds per
square inch (psig). This special permit provides relief from the specified Federal pipeline safety
regulations for the Empire State Pipeline and requires Empire to comply with certain conditions
and limitations designed to maintain pipeline safety.
PHMSA grants this special permit based on the findings set forth in the "Special Permit Analysis
and Findings" document, which can be read in its entirety in Docket No. PHMSA-2008-0213 in
the Federal Docket Management System (FDMS) located on the internet at
www.Regulations.gov.
My staff would be pleased to discuss this special permit or any other regulatory matter with you.
John Gale, Director of Regulations (202-366-0434), may be contacted on regulatory matters and
Alan Mayberry, Deputy Associate Administrator for Pipeline Safety (202-366-5124), may be
contacted on technical matters specific to this special permit.
Jeffrey D. Wiese
Associate Administrator for Pipeline Safety
Enclosure (Special Permit)

<<<PAGE 1>>>

U.S. Department ofTransportation
Pipeline cmd Hazardous Materials
Safety Administration
1200 New Jersey Ave, S.E.
Washington, D.C. 20590
JUL 3 0 2014
Mr. Ronald C. Kraemer
President
Empire Pipeline, Inc.
6363 Main Street
Williamsville, NY 14221-5887
Ref: Special Permit · PHMSA-2008-0213
Dear Mr. Kraemer:
The Pipelme and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety hereby gives notice that special permit PHMSA-2008-0213 issued to Empire Pipeline,
Inc. (Empire) on March 20, 2010, will expire on March 20, 2015.
If Empire wishes to renew this special permit, the PHMSA Associate Administrator for
Pipeline Safety must be notified at least !80 days prior to the expiration of the Special Permit.
The procedures for renewal are outlined on the following pages.
My staff would be pleased to discuss this special permit or any other regulatory matter with
you. Mr. John Gale, Director of Standards and Rulemaking Division, may be contacted at 202-
366-0434 for regulatory matters, and Mr. Ken Lee, Director of Engineering and Research
Division, may be contacted at 202-366-2694 for technical matters specific to the renewal of this
special permit.
Sincerely,
A~~f~
~ Associate Administrator for Pipeline Safety

<<<PAGE 2>>>

The Pipeline and Hazardous Materials Safety Administration (PHMSA)
Office of Pipeline Safety (OPS)
Federal Special Permit Renewal Requirements
June 2014
Special permits issued with an expiration date must be renewed prior to the expiration of the
special permit. Special permits requiring renewal are defined as: Special permits issued with an
expiratioc date in the "limitations" section of the existing special permit. A notice of intent to
renew the expiring special permit must be made at least 180 days prior to the expiration.
Renewal requests sent by United States Postal Service mail, express mail, or overnight courier,
must be addressed to:
Tt.e Associate Administrator for Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
1200 New Jersey Avenue, SE, East Building
Washington, DC 20590
To expedite the delivery of the renewal application and attachments, we encourage pipeline
operators to provide us with an electronic copy of the renewal application. The electronic copy
renewal request must be sent by e-mail to John.Gale@dot.gov and kay.mciver@dot.gov.
Please do not fax PHMSA renewal requests or documents.
PHMSA may seek additional operational, integrity or environmental assessment information
prior to granting any request for special permit.
The renewal application must contain:
(a) Special Permit: A copy of the original grant of the special permit.
(b) Docket: PHMSA Docket Number of the issued special permit
(c) Summary Report: A summary report that defines the following information from the
issuance of the special permit to present.
(i) Special Permit Number
(ii) Grantee, or Pipeline Owner or Operator:
1) Parent Company:
2) Executive Contact: Mailing Address, Phone Number and e-mail
address; and
3) Technical or Operational Contact: Mailing Address, Phone Number
and e-mail address.
(iii) Location of Special Permit: areas on the pipeline where the special
permit is applicable including: diameter, mile posts, county, and state.
(iv) Applicable Usage or Need of the Special Permit: original and future
including applicable Federal Code sections for special permit.
Empire Pipeline, Inc. - PHMSA-2008-0213
Page 2 of 4

<<<PAGE 3>>>

( v) Annual Report: A copy of each special permit annual report generated
since the issuance of the special permit (maximum of 5 reports). [Reports
on file. Not needed at this time.].
(vi) Operating Pressure for Special Permit Segment: Maximum allowable
operating pressure (MAOP); class location (including boundaries on aerial
photography).
(vii) High Consequence Areas (HCAs) for Special Permit Segment: HCA
boundaries on aerial photography;
(viii) Material Properties for Special Permit Segment: Pipeline material
documentation for all pipe, fittings, flanges, and any other facilities
included in the special permit. Material documentation for the special
permit segments must include applicable:
1) Pipe: diameter, wall thickness, grade, and seam type; pipe coating
including girth weld coating;
2) MechanicaUChemical Properties: yield strength, tensile strength, and
chemical composition. (Operator may furnish an example mill test
report (mechanical and chemical properties) for the special permit
segment pipe. PHMSA will determine the need for complete
documents based upon the example mill test report and original
submittals.);
3) Test Pressure: Hydrostatic test pressure and date including pressure
and temperature charts and logs and any known test failures; (Operator
may contact PHMSA to determine if charts and logs are needed based
upon original submittal.)
(ix) In-line inspection (ILl) for Special Permit Segments and Areas: ILl
survey summary results from all ILl tools used on the special permit
segments and areas during the previous four (4) years, summary to
include any actionable anomalies or dents found, and all cracks in pipe
body, pipe seam or girth weld.
(x) Integrity Data Integration Summary for Special Permit: Integrity data
integration summary must be based upon threats as identified in
Condition 4 (in accordance with 49 CFR §§ 192.937 (a) and (b), 192.917,
and 192.939), as applicable, for the past four ( 4) years including: class
location, HCAs, hydrostatic test pressure including any known test failures
-if tests were conducted; casings (any shorts); any in-service ruptures or
leaks; close interval survey (CIS) results; depth of cover surveys; rectifier
readings; test point survey readings; AC/DC interference surveys; pipe
coating SJlrveys; pipe coating and anomaly evaluations from pipe
excavations and pipe exposures from encroachments; stress con·osion
cracking, selective seam weld corrosion and hard spot excavations and
findings.
(xi) In-service incidents for Special Permit Segments and Areas: Any in-
service ruptures or leaks including repair type and failure investigation
findings; aerial photography of area, within the special permit segment and
special permit inspection area, if applicable.
Empire Pipeline, Inc.- PHMSA-2008-0213
Page 3 of 4

<<<PAGE 4>>>

(xii) Special Permit Conditions: any suggested condition modifications
required to maintain safety and the environment.
(xiii) Summary Report: The summary report must demonstrate that the special
permit is still consistent with pipeline safety and show that the operations
and management plan (O&M Plan) has periodic and systemic integrity
assessment and remedial measures to ensure that there is an ongoing
program to locate, assess, and remediate safety threats.
(d) Renewals: For renewal requests made at least 180 days before the special permit expires
and that conform to the requirements of the renewal process, the special permit will
continue to be in effect and not expire until PHMSA takes a final administrative action
on the renewal. After all documents are reviewed and the Associate Administrator,
Office of Pipeline Safety, determines that the Special Permit is consistent with federal
regulations for public safety and the environment, a letter of decision and an updated
special permit will be mailed to the operator. The Special Permit letter of decision,
conditions, and findings and analysis will be placed in the corresponding docket at
www .regulations.gov.
(e) State Partners: State partners in the affected state/swill be notified of the renewal
application. A Federal Register Notice of the renewal application will be initiated for a
30·day comment period.
(f) Environmental Assessment: An Environmental Assessment (EA) may not be needed if
one was conducted and noticed for the original special permit. If an EA must be
conducted, then the renewal process will be lengthier. The operator will be responsible
for developing and submitting the EA documents. PHMSA will review the EA for
conformity to National Environmental Policy Act and federal pipeline regulations. The
EA will be publicized in the Federal Register for a 30-day comment period.
(g) Denial of renewal request: If the Special Permit request is denied, the denial will be
handled in accordance with the procedures outlined in 49 CFR § 190.341.
Empire Pipeline, Inc.- PHMSA-2008-0213
Page 4 of 4

<<<PAGE 1>>>

U.S. Department of Transportation
Pipeline and Hazardous Materials
Safety Administration
1200 New Jersey Ave, S.E.
Washington, D.C. 20590
AUG 12 2014
Mr. Ronald C. Kraemer
President
Empire Pipeline, Inc.
6363 Main Street
Williamsville, NY 14221-5887
Ref: Correction to issuance and renewal date of Special Permit - PHMSA-2008-0213
Dear Mr. Kraemer:
In keeping with a conversation between Ms. Kay Mciver of PHMSA staff and Jim Sharpless of
Empire Pipeline, Inc., this letter is being sent to give notice and correct the issued and
expiration date of Special Permit, PHMSA-2008-0213.
The Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety hereby gives notice that special permit PHMSA-2008-0213 issued to Empire Pipeline,
Inc. (Empire) on May 20, 2010, will expire on May 20, 2015.
If Empire wishes to renew this special permit, the PHMSA Associate Administrator for
Pipeline Safety must be notified at least 180 days prior to the expiration of the Special Permit.
The procedures for renewal are outlined on the following pages.
My staff would be pleased to discuss this special permit or any other regulatory matter with
you. Mr. Kenneth Lee, Director of Engineering and Research Division, may be contacted at
202-366-2694 for technical matters. I can be contacted at 202-366-0434 for regulatory matters
specific to the renewal of this special permit.
Director, Standards and Rulemaking

<<<PAGE 2>>>

AUG 12 2014
The Pipeline and Hazardous Materials Safety Administration (PHMSA)
Office of Pipeline Safety (OPS)
Federal Special Permit Renewal Requirements
June 2014
Special permits issued with an expiration date must be renewed prior to the expiration of the
special permit. Special permits requiring renewal are defined as: Special permits issued with an
expiration date in the "limitations" section of the existing special permit. A notice of intent to
renew the expiring special permit must be made at least 180 days prior to the expiration.
Renewal requests sent by United States Postal Service mail, express mail, or overnight courier,
must be addressed to:
The Associate Administrator for Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
1200 New Jersey Avenue, SE, East Building
Washington, DC 20590
To expedite the delivery of the renewal application and attachments, we encourage pipeline
operators to provide us with an electronic copy of the renewal application. The electronic copy
renewal request must be sent by e-mail to John.Gale@dot.gov and kay.mciver@dot.gov.
Please do not fax PHMSA renewal requests or documents.
PHMSA may seek additional operational, integrity or environmental assessment information
prior to granting any request for special permit.
The renewal application must contain:
(a) Special Permit: A copy of the original grant of the special permit.
(b) Docket: PHMSA Docket Number of the issued special permit
(c) Summary Report: A summary report that defines the following information from the
issuance of the special permit to present.
(i) Special Permit Number
(ii) Grantee, or Pipeline Owner or Operator:
1) Parent Company:
2) Executive Contact: Mailing Address, Phone Number and e-mail
address; and
3) Technical or Operational Contact: Mailing Address, Phone Number
and e-mail address.
Empire Pipeline, Inc.- PHMSA-2008-0213
Page 2 of 4

<<<PAGE 3>>>

AUG 12 2014
(iii) Location of Special Permit: areas on the pipeline where the special
permit is applicable including: diameter, mile posts, county, and state.
(iv) Applicable Usage or Need of the Special Permit: original and future
including applicable Federal Code sections for special permit.
(v) Annual Report: A copy of each special permit annual report generated
since the issuance of the special permit(maximum of 5 reports). [Reports
on file. Not needed at this time.].
(vi) Operating Pressure for Special Permit Segment: Maximum allowable
operating pressure (MAOP); class location (including boundaries on aerial
photography).
(vii) High Consequence Areas (HCAs) for Special Permit Segment: HCA
boundaries on aerial photography;
(viii) Material Properties for Special Permit Segment: Pipeline material
documentation for all pipe, fittings, flanges, and any other facilities
included in the special permit. Material documentation for the special
permit segments must include applicable:
1) Pipe: diameter, wall thickness, grade, and seam type; pipe coating
including girth weld coating;
2) Mechanical/Chemical Properties: yield strength, tensile strength, and
chemical composition. (Operator may furnish an example mill test
report (mechanical and chemical properties) for the special permit
segment pipe. PHMSA will determine the need for complete
documents based upon the example mill test report and original
submittals.);
3) Test Pressure: Hydrostatic test pressure and date including pressure
and temperature charts and logs and any known test failures; (Operator
may contact PHMSA to determine if charts and logs are needed based
upon original submittal.)
(ix) In-line inspection (ILl) for Special Permit Segments and Areas: ILl
survey summary results from all ILl tools used on the special permit
segments and areas during the previous four ( 4) years, summary to
include any actionable anomalies or dents found, and all cracks in pipe
body, pipe seam or girth weld.
(x) Integrity Data Integration Summary for Special Permit: Integrity data
integration summary must be based upon threats as identified in
Condition 4 (in accordance with 49 CFR §§ 192.937 (a) and (b), 192.917,
and 192.939), as applicable, for the past four (4) years including: class
location, HCAs, hydrostatic test pressure including any known test failures
-if tests were conducted; casings (any shorts); any in-service ruptures or
leaks; close interval survey (CIS) results; depth of cover surveys; rectifier
readings; test point survey readings; AC/DC interference surveys; pipe
coating surveys; pipe coating and anomaly evaluations from pipe
excavations and pipe exposures from encroachments; stress corrosion
cracking, selective seam weld corrosion and hard spot excavations and
findings.
Empire Pipeline, Inc.- PHMSA-2008-0213
Page 3 of 4

<<<PAGE 4>>>

AUG 12 10\~
(xi) In-service incidents for Special Permit Segments and Areas: Any in-
service ruptures or leaks including repair type and failure investigation
findings; aerial photography of area, within the special permit segment and
special permit inspection area, if applicable.
(xii) Special Permit Conditions: any suggested condition modifications
required to maintain safety and the environment.
(xiii) Summary Report: The summary report must demonstrate that the special
permit is still consistent with pipeline safety and show that the operations
and management plan (O&M Plan) has periodic and systemic integrity
assessment and remedial measures to ensure that there is an ongoing
program to locate, assess, and remediate safety threats.
(d) Renewals: For renewal requests made at least 180 days before the special permit expires
and that conform to the requirements of the renewal process, the special permit will
continue to be in effect and not expire until PHMSA takes a final administrative action
on the renewal. After all documents are reviewed and the Associate Administrator,
Office of Pipeline Safety, determines that the Special Permit is consistent with federal
regulations for public safety and the environment, a letter of decision and an updated
special permit will be mailed to the operator. The Special Permit letter of decision,
conditions, and findings and analysis will be placed in the corresponding docket at
www .regulations.gov.
(e) State Partners: State partners in the affected state/s will be notified of the renewal
application. A Federal Register Notice of the renewal application will be initiated for a
30-day comment period.
(f) Environmental Assessment: An Environmental Assessment (EA) may not be needed if
one was conducted and noticed for the original special permit. If an EA must be
conducted, then the renewal process will be lengthier. The operator will be responsible
for developing and submitting the EA documents. PHMSA will review the EA for
conformity to National Environmental Policy Act and federal pipeline regulations. The
EA will be publicized in the Federal Register for a 30-day comment period.
(g) Denial of renewal request: If the Special Permit request is denied, the denial will be
handled in accordance with the procedures outlined in 49 CFR § 190.341.
Empire Pipeline, Inc.- PHMSA-2008-0213
Page 4 of 4

<<<PAGE 1>>>

empire Pipeline
A National Fuel Gas Company
Ronald C. Kraemer
President
May 18, 2018
Robert Burrough, Director
PHMSA Pipeline Safety
Eastern Region Office
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
RE: Empire State Pipeline
DOCKET NO. PHMSA-2008-0213
Gentlemen:
On May 20, 2010, the Pipeline and Hazardous Materials Safety Administration ("PHMSA")
granted Empire Pipeline, Inc. ("Empire") a special permit in the proceeding referenced above
allowing Empire to continue to operate five segments of its pipeline system at their current MAOP
of 1440 pounds per square inch (the "Special Permit"). On May 20, 2015, PHMSA renewed and
modified the Special Permit for a term ending May 20, 2020. On March 28, 2017, PHMSA again
modified the Special Permit to add a sixth special permit segment.
Pursuant to Condition 15 to the Special Permit as renewed and modified, attached is Empire's
eighth annual report.
Questions regarding this submission should be directed to the undersigned at (716) 857-7536.
Very truly yours,
Ronald C. Kraemer, President
Enclosures
CC:
John Gale, Director
PHMSA Standards and Rulemaking Division
1200 New Jersey Ave., SE
U.S. Department of Transportation
Washington, DC 20590

<<<PAGE 2>>>

Kevin Speicher, Chief-Safety Section
New York State Public Service Commission
Department of Public Service
3 Empire State Plaza
Albany, New York 12223-1350
electronically filed at regulations.gov in Docket PHMSA-2008-0213
Page 2 of 5

<<<PAGE 3>>>

EIGHTH ANNUAL REPORT
OF
EMPIRE PIPELINE, INC. (“EMPIRE”)
DOCKET NO. PHMSA-2008-0213
ITEM A: Describe the economic benefit to the company. This should address both the
costs avoided from not replacing pipe as well as the added costs of the
inspection program. This should be required for initial report only.
Subsequent reports will address any changes.
RESPONSE: No changes to report. Although there have been no substantial changes to
the physical sections of pipe that would need to be replaced were PHMSA to
have not issued this special permit, the costs of contractors, materials and
inspection for pipeline construction continue to rise on an annual basis.
Empire does not prepare/revise this estimate annually. In summary, the
economic benefit (avoided costs) continue to increase with each year that the
Special Permit is in place.
ITEM B: Describe how the public benefits from energy availability. This should
address the benefits of avoided disruptions as a consequence of pipe
replacement and the benefits of maintaining system capacity. Subsequent
reports will address any changes.
RESPONSE: Empire anticipates the continued and increased need for pipeline capacity on
its system, as a result of the abundant Marcellus and Utica Shale Gas supplies
immediately to the south of the Empire Connector Pipeline, in Pennsylvania.
Pursuant to FERC certificate authorization in Docket No. CP11-493-000,
Empire extended its system into Pennsylvania, providing a new source of
high pressure supply (1,290 psig) into the pipeline system. The design of
these facilities required the replacement of a 1.3 mile section of 1,000 psig
pipeline, with pipe capable of 1,440 psig – extending eastward the 1,440 psig
section of the special permit inspection area. These facilities were placed in
service in November of 2011. Empire is in the process of designing
additional facilities to meet requests for incremental capacity, which would
likely involve Marcellus Shale gas deliveries into the Empire Pipeline at
pressures up to the 1,440 psig MAOP. A reduction in MAOP would preclude
Empire from developing the capacity needed to access these economic,
incremental gas supplies.
Please refer to Empire’s initial report for additional discussion of public
benefits.
ITEM C: Number of new residences, other structures intended for human occupancy
and public gathering areas built within one (1) mile on either end of the
special permit segments.
RESPONSE: Empire meets with contractors and developers to track all proposed future
developments in the vicinity of the pipeline. Since the special permit
Page 3 of 5

<<<PAGE 4>>>

application was submitted on August 8, 2008, four (4) new houses or other
structures have been constructed in the special permit segments. Based on
GIS data, within one (1) mile on either end of each special permit segment,
there are currently 307 occupied structures (BIHOs) and six (6) gathering
sites within 660 feet of the pipeline center line, including 17 BIHOs and no
gathering sites identified since the previous annual report. Without Empire’s
compliance with the conditions of the special permit, many of the residents
outside the special permit segments would not benefit from the integrity
enhancements associated with this special permit such as the full pipeline ILI.
Additional houses and gathering places are continually reviewed for any
impact on the current class location designation for other sections of the
pipeline.
ITEM D: Describe any new integrity threats identified during the previous year and the
results of any ILI or Direct Assessments performed (including any un-
remediated anomalies over 30% wall loss; cracking found in the pipe body,
weld seam or girth welds; and dents with metal loss, cracking or stress riser)
during the previous year in the special permit inspection area.
RESPONSE: Empire did not identify any new integrity threats in the special permit
inspection area in the previous 12 months. An External Corrosion Direct
Assessment was performed in Special Permit Segment 6 in August, 2017.
Empire did not identify any un-remediated anomalies over 30% wall loss;
cracking found in the pipe body, weld seam or girth welds; nor dents with
metal loss, cracking or a stress riser.
ITEM E: Any reportable incident, any leak normally indicated on the DOT Annual
Report and all repairs on the pipeline that occurred during the previous year
in the special permit inspection area.
RESPONSE: There were no reportable incidents or leaks on the pipeline in the special
permit inspection area during the previous 12 months.
ITEM F: Any ongoing damage prevention initiatives affecting the special permit
inspection area and a discussion of the success of the initiatives.
RESPONSE: Excavation, use of augers, directional drilling, logging and other earth
moving activities are common examples of third party activities that could
lead to damage to transmission pipelines. Empire’s damage prevention
programs, including participation in a One Call System and public education,
reduce the risk exposure to the activities of outside contractors, farmers,
landowners, public works, other utilities or the operator that can result in
pipeline damage. Empire sponsored five (5) New York Dig Safely
Excavation Safety Seminars in an effort to reach out to additional contractors
in the operating area during 2018. Locations of the Empire Pipeline at all
roads and railroads are marked as required in 49 CFR 192.707. The line’s
position is flagged/marked for anyone notifying Dig Safely New York of
their intent to excavate or perform construction in the vicinity of the pipeline.
Empire personnel stand by for all excavations within 25 feet of the pipeline.
Page 4 of 5

<<<PAGE 5>>>

Hand excavation is required within 24 inches of the line. Bi-annually, all
owners and occupants of property within 660 feet of the pipeline receive a
pamphlet describing the pipeline, safety considerations, and numbers to call
with any questions or concerns. Area contractors and first responders, such
as fire and police departments, are also offered training each year through a
third-party contractor, and beginning in May 2017 National Fuel and Empire
began offering a seven-part, self-directed, interactive, online training
program that provides emergency response personnel with the information
they need to safely identify and respond to incidents that involve natural gas
pipelines and other natural gas facilities. Aerial and foot patrols are used to
monitor encroachment and construction activity along the pipeline.
The New York Public Service Commission (as agent for PHMSA) conducted
a special permit audit during June 2012 and reviewed Empire’s damage
prevention program for compliance. More recently, a PHMSA audit of the
Empire Pipeline was conducted in July 2014, including a review of Empire’s
damage prevention program. Previous inspections of the operation and
maintenance of the Empire Pipeline have confirmed Empire’s regulatory
compliance. There are no outstanding safety issues.
ITEM G: Any mergers, acquisitions, transfers of assets, or other events affecting the
regulatory responsibility of the company operating the pipeline.
RESPONSE: There have been no mergers, acquisitions, transfers of assets, or other events
affecting the regulatory responsibility of Empire.
Page 5 of 5

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
April 24, 2020
Mr. Ronald C. Kraemer
President
Empire Pipeline, Inc.
6363 Main Street
Williamsville, New York 14221-5887
Ref: Special Permit Renewal - May 20, 2020 to May 20, 2030
Docket No. PHMSA-2008-0213
Dear Mr. Kraemer:
On November 22, 2019, pursuant to 49 Code of Federal Regulations (CFR) § 190.341, the
Empire Pipeline, Inc. (Empire) applied to the Pipeline and Hazardous Materials Safety
Administration (PHMSA) for the renewal of the special permit, PHMSA-2008-0213, originally
issued on May 20, 2010 and renewed on May 20, 2015. On August 19, 2016, Empire applied to
PHMSA for an extension of an additional segment to the special permit. On March 3, 2017,
special permit segment six (6) was added and the expiration date of all segments was kept as
May 20, 2020. The special permit waives compliance with 49 CFR § 192.611(a) for six (6)
pipeline segments where the class location has changed from a Class 1 to a Class 3 location.
The six (6) special permit segments total 10,475 feet of 24-inch diameter pipe on the Empire
State Pipeline located in Genesee, Monroe, Niagara, and Wayne Counties, New York. The
special permit allows Empire to continue operation of the original Class 1 pipe in Class 3
locations, subject to the conditions set forth in the special permit.
On March 9, 2020, PHMSA published a Federal Register notice (85 FR 13703) announcing the
special permit renewal request. The special permit renewal request letter and all other pertinent
documents are available for review in Docket No. PHMSA-2008-0213 in the Federal Docket
Management System located at www.regulations.gov.

<<<PAGE 2>>>

One comment was submitted to the docket on April 7, 2020, stating that the counties that the six
(6) pipeline segments are in are home to Iroquois tribes.1 The commenter did not object to the
proposed renewal or any aspect of the proposed renewal. Instead, the commenter cited various
judicial opinions resulting from Native American challenges to other government agencies
dealing with pipeline construction. This special permit is for continuing the safe operation and
maintenance of an existing pipeline. Furthermore, PHMSA has not received a request for tribal
consultation related to this special permit renewal.
PHMSA has reviewed all operational and maintenance data submitted by Empire for the special
permit segments. PHMSA finds that there has been no material change in conditions and that
Empire continues to meet the terms of the special permit. Based on the information provided by
Empire, PHMSA has determined that renewal of the special permit would not be inconsistent
with pipeline safety. Furthermore, PHMSA is modifying the special permit renewal timing
interval from 5 years to 10 years in Limitation 7. The modifications to Limitation 7 are italicized
and underlined below.
Limitation 7: PHMSA grants this special permit for a period of no more than ten (10) years
from the grant date. If Empire elects to seek renewal of this special permit, a renewal request
must be submitted at least 180 days prior to expiration of the ten-year period, to the PHMSA
Associate Administrator, with copies to the Director, Division of Engineering and Research, and
Director, Office of Pipeline Safety, Eastern Region. PHMSA may seek additional information
from Empire prior to granting a request for special permit renewal.
Accordingly, pursuant to 49 CFR § 190.341, by this Order, and as outlined in the existing
special permit, PHMSA grants the renewal of PHMSA-2008-0213, from May 20, 2020,
through May 20, 2030, to Empire to continue its operation of the Empire State Pipeline in
Genesee, Monroe, Niagara, and Wayne Counties, New York. This special permit renewal
Order continues to waive compliance with certain Federal regulations in 49 CFR
§ 192.611(a)(1).
My staff would be pleased to discuss this special permit or any other regulatory matter with you.
Sentho White, Director of Engineering and Research Division, may be contacted at 202-366-
2415, for technical matters; and Robert Burrough, Director, Office of Pipeline Safety, Eastern
Region may be contacted at 609-771-7809, for operational matters specific to the renewal of this
special permit.
Sincerely,
ALAN
KRAMER
MAYBERRY
Digitally signed by
ALAN KRAMER
MAYBERRY
Date: 2020.04.24
15:20:19 -04'00'
Alan K. Mayberry,
Associate Administrator for Pipeline Safety
1 https://www.regulations.gov/searchResults?rpp=25&po=0&s=PHMSA-2008-0213
PHMSA-2008-0213 – Empire Pipeline, Inc.
Special Permit Renewal - May 20, 2020 to May 20, 2030 Page 2 of 2

<<<PAGE 1>>>

1
U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION (PHMSA)
Special Permit Analysis and Findings
Special Permit Information:
Docket Number:
Pipeline Operator:
Date Requested:
Code Section(s):
PHMSA-2008-0213
Empire Pipeline, Inc., (operator of Empire State Pipeline)
August 8, 2008
49 CFR § 192.61l(a)
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) provides this
information to describe the facts of the subject special permit application submitted by Empire
Pipeline, Inc. (Empire), operator ofthe Empire State Pipeline. PHMSA also provides discussion
of any relevant public comments received with respect to the application, presents the
engineering and safety analysis of the special permit application, and makes findings regarding
whether the requested special permit should be granted and if so under what conditions.
Pipeline System Affected:
This special permit request involves five (5) special permit segments along Empire's 24-inch
natural gas transmission pipeline known as the Empire State Pipeline. The five special permit
segments are located in Niagara, Genesee, and Monroe Counties, NY. The class location ofthe
special permit segments have changed from Class 1 Locations to Class 2 Location or a Class 21
Locations to Class 3 Locations.
Niagara, Genesee, and Monroe Counties, NY
1 The Class 3 segments were originally a Class I Location that was upgraded to Class 2 Location by reason of
hydrostatic test in accordance with § 192.611(a).

<<<PAGE 2>>>

2
This special permit applies to the special permit segments defined using Empire's Survey Station
Numbers. Mileposts are provided for information only.
• Special Permit Segment 1 - 24-inch Empire State Pipeline mainline, approximately 730 feet
in length, located in Genesee County, New York, from Survey Station 3027 + 50 to Survey
Station 3034 + 80; (MP 57.33 to MP 57.49)
• Special Permit Segment 2 - 24-inch Empire State Pipeline mainline, approximately 1,715
feet in length, located in Monroe County, New York, from Survey Station 4018 + 73 to
Survey Station 4035 + 88; (MP 76.09 to MP 76.42)
• Special Permit Segment 3 - 24-inch Empire State Pipeline mainline, approximately 1,650
feet in length, located in Monroe County, New York, from Survey Station 4483 + 10 to
Survey Station 4499 + 60; (MP 84.88 to MP 85.19)
• Special Permit Segment 4 - 24-inch Empire State Pipeline mainline, approximately 2,675
feet in length, located in Niagara County, New York, from Survey Station 1230 + 69 to
Survey Station 1257 + 44; (MP 23.30 to MP 23.81)
• Special Permit Segment 5, 24-inch Empire State Pipeline mainline, approximately, 1,760
feet in length, located in Niagara County, New York, from Survey Station 1330 + 50 to
Survey Station 1348 + 10; (MP 25.19 to MP 25.54)
Niagara, Genesee, Monroe, Ontario, Wayne, Cayuga, Onondaga and Oswego Counties, NY
Special permit inspection area - means the area that extends 220 yards on each side of the
centerline of 24" mainline along the entire length ofthe Empire State Pipeline from Mile Post 0
(NY/Canada Border) to Mile Post 157 (Phoenix, NY). The special permit inspection area is
located in Niagara, Genesee, Monroe, Ontario, Wayne, Cayuga, Onondaga and Oswego
Counties, NY. The total length of the special permit inspection area is approximately 157 miles.
The Empire State Pipeline special permit inspection area includes the following sections:
• Western Section - from Mile Post 0 in Niagara County, New York to Mile Post 90.8 in
Ontario County, New York and the pipeline has an MAOP of 1440 pounds per square
inch gauge (psig); and
• Eastern Section - from Mile Post 90.8 in Ontario County, New York to Mile Post 157 in
Oswego County, New York and the pipeline has an MAOP of 1000 psig.

<<<PAGE 3>>>

3
Special Permit Request
Empire submitted an application to PHMSA on August 8, 2008, for a special permit seeking
relief from the Federal pipeline safety regulations in 49 CFR § 192.611(a) for five (5) segments
of the Empire State Pipeline where a change has occurred from a Class 1 or 2 to Class 3
Locations. As requested, this special permit would allow Empire to continue to operate the
pipeline segments at their current maximum allowable operating pressure (MAOP) of 1440 psig
in the Western Section and 1000 psig in the Eastern Section. The Federal pipeline safety
regulations in 49 CFR § 192.611(a) require natural gas pipeline operators to confirm or revise the
MAOP of a pipeline segment after a change in class location. A special permit would allow
Empire to continue to operate each of the five (5) special permit segments at their existing
MAOP's despite a change in class location.
In its application, Empire suggested that the five (5) special permit segments be included in one
separate special permit inspection area (see Empire's applicat,ion for the specific details). The
special permit inspection area on the Empire State Pipeline will begin approximately 23.3 miles
upstream of the beginning of the special permit segment 1 extend through the five special permit
segments and end approximately 71.8 miles downstream of the ending of special permit
segment 5, The total length of the special permit inspection area is approximately 157 miles.
Public Notice:
On January 23,2009, PHMSA posted a notice of this special permit request in the Federal
Register (74 FR 4297). The request letter, Federal Register notice and all related documents are
available for review in Docket No. PHMSA-2008-0213 in the Federal Docket Management
System (FDMS) located on the internet at www.Regulations.gov.
PHMSA did not receive any public comments on this special permit request.
Analysis:
Background: On June 29, 2004, PHMSA published in the Federal Register (69 FR 38948) the
criteria it uses for the consideration of class location change waivers, now being granted through
special permits. First, certain threshold requirements must be met for a pipeline section to be
further evaluated for a class location change special permit. Second, the age and manufacturing

<<<PAGE 4>>>

4
process of the pipe; system design and construction; environmental, operating and maintenance
histories; and integrity management program elements are evaluated as significant criteria.
These significant criteria are presented in matrix form and can be reviewed in the FDMS, Docket
Number PHMSA-2004-1740I. Third, such special permits may only then be granted when pipe
conditions and active integrity management provide a level of safety greater than or equal to a
pipe replacement or pressure reduction.
Threshold Requirements: Each of the threshold requirements published by PHMSA in the
June 29, 2004, FR notice is discussed below in regards to the Empire special permit petition.
1) No pipeline segments in a class location changing to Class 4 Location will be considered.
This special permit request is for five segments of Empire's Empire State Pipeline where a
class location change has occurred from Class 1 Location to Class 3 Location or Class 2
Location to Class 3 Location. Empire has met this requirement.
2) No bare pipe will be considered. The Empire special permit segments are coated with fusion
bonded epoxy (FBE) coating. Empire has met this requirement.
3) No pipe containing wrinkle bends will be considered. There are no wrinkle bends in this
special permit segment.
- **truncated:** true