# Columbia Gulf Transmission (CGT) — Pipeline Special Permit

- **operation:** document
- **citation:** PHMSA-2022-0084
- **title:** Columbia Gulf Transmission (CGT) — Pipeline Special Permit
- **source type:** permit
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2023-06-30
- **effective on:** 2023-06-30
- **summary:** PHMSA-2022-0084, issued 2023-06-30 for Columbia Gulf Transmission (CGT)'s gas transmission system.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2022-0084.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2022-0084.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-special-permit-phmsa-2022-0084
- **source url:** https://www.regulations.gov/docket/PHMSA-2022-0084
**body:**

PHMSA pipeline special permit PHMSA-2022-0084. Operator: Columbia Gulf Transmission (CGT). System: Gas Transmission. Issue date: 2023-06-30.

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
Special Permit Analysis and Findings
Class 1 to 3 Location
Special Permit Information:
Docket Number: PHMSA-2022-0084
Requested By: Columbia Gulf Transmission, LLC
Operator ID#: 2620
Original Date Requested: June 22, 2022
Original Issuance Date: June 30, 2023
Code Section(s): 49 CFR 192.611(a) and (d) and 192.619(a)
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS),
1 provides this information to describe the facts of the subject special permit application
submitted by Columbia Gulf Transmission, LLC (CGT),
2 to discuss any relevant public comments
received with respect to the application, to present the engineering and safety analysis of the
special permit application, and to make findings regarding whether the requested special permit
should be granted and, if so, under what conditions. CGT requested that PHMSA waive
compliance from the 49 Code of Federal Regulations (CFR) 192.611(a) and (d) and 192.619(a) for
natural gas transmission pipeline segments, where the class location has changed from a Class 1 to
a Class 3 location.
1 Throughout this special permit the usage of “PHMSA” or “PHMSA OPS” means the U.S. Department of
Transportation’s Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety.
2 CGT is a wholly owned, subsidiary of TC Energy.
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 1 of 12

<<<PAGE 2>>>

Pipeline System Affected:
This special permit applies to the CGT request for a waiver from the class location change
requirements in 49 CFR 192.611 for approximately 5.066 miles of 30-inch diameter gas
transmission pipelines and 2.749 miles of 36-inch diameter gas transmission pipelines located in
Madison County, Kentucky. Without this special permit, 49 CFR 192.611(a) would require CGT
to replace the seven (7) special permit segments with stronger pipe or reduce the pipeline
maximum allowable operating pressure (MAOP) for a Class 1 to Class 3 location change.
Table 1 – Pipe Specifications by Line Name
Special
Outside
Wall
Min. Test
Year
Permit
Line Name
Diameter
Installed
Seam
Type MAOP
Coating Type Grade
Thickness
Pressure
(psig)
Segment
(inches)
(inches)
(psig)
1 ML 100 30 1954 DSAW Coal Tar Enamel X52 0.375 935 1,220 2 ML 200 30 1963/1964 DSAW Coal Tar Enamel X60 0.360 1,007 1,323 3 ML 300 36 1970 DSAW Coal Tar Enamel X65 0.388 1,007 1,338 4 ML 300 36 1970 DSAW Coal Tar Enamel X65
X60
0.388
0.625 1,007 1,338 5 ML 100 30 1954 DSAW Coal Tar Enamel X52 0.375 935 1,241 6 ML 200 30 1963/1964 DSAW Coal Tar Enamel X60 0.375 1,007 1,355 7 ML 300 36 1970 DSAW Coal Tar Enamel X60 0.504
0.605 1,007 1,369 Note: DSAW is double submerged arc welded pipe weld seam type.
Psig means pounds per square inch gauge.
Special Permit Request:
On June 22, 2022, CGT applied to PHMSA for a special permit seeking relief from 49 CFR
192.611(a) and (d) and 192.619(a) for the below listed special permit segments, where a class
location change occurred from the original Class 1 to a Class 3 on the 30-inch diameter ML 100
and ML 200 and 36-inch diameter ML 300 Pipelines located in Madison County, Kentucky.
Special Permit Segments:
This special permit applies to the special permit segments in Table 2 – Special Permit
Segments.
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 2 of 12
Pressure
Test
Factor
1.305
1.314
1.329
1.329
1.327
1.346
1.359

<<<PAGE 3>>>

Table 2 – Special Permit Segments
Pressure
Material
Special
Permit
Start
End
Test
Outside
Records –
Line
Diameter
Name
Length
(feet)
Survey
Station
Survey
Station
County,
State
No.
Year
Seam
MAOP
Records
Condition
Segment
Number
Dwellings
Installed
Type
(psig)
Condition
(inches)
(SS)
(SS)
1(b)
13(d)
required4
1 30 ML 100 6,600 2618+00 2684+00 Madison,
KY 47 1954 DSAW 935 required3
No Yes
2 30 ML 200 6,500 2620+00 2685+00 Madison,
KY 44 1963/1964 DSAW 1,007 No Yes
3 36 ML 300 7,450 2608+50 2683+00 Madison,
KY 47 1970 DSAW 1,007 No Yes
4 36 ML 300 165 2853+40 2855+05 Madison,
KY 1 1970 DSAW 1,007 No Yes
5 30 ML 100 6,800 3219+00 3287+00 Madison,
KY 50 1954 DSAW 935 No Yes
6 30 ML 200 6,850 3221+50 3290+00 Madison,
KY 48 1963/1964 DSAW 1,007 Yes Yes
7 36 ML 300 6,900 3218+00 3287+00 Madison,
KY 47 1970 DSAW 1,007 No Yes
Notes: DSAW is a double submerged arc welded pipe longitudinal seam.
The pipe external coating is coal tar enamel for each special permit segment.
Special Permit Inspection Area:
The special permit inspection area is defined as the area that extends 220 yards on each side of the
centerline as listed in Table 3 – Special Permit Inspection Area.
Table 3 – Special Permit Inspection Areas
Special
Special Permit
Outside
Start Survey
End Survey
Permit
Length5
Inspection
Diameter
Line Name
Station
Station
Segment(s)
(miles)
Area Number
(inches)
(SS)
(SS)
Included
1 1, 5 30 ML 100 10+58 3374+89 63.72
2 2, 6 30 ML 200 12+23 4232+00 79.92
3 3, 4, 7 36 ML 300 0+58 4226+74 80.04
The special permit inspection areas are in Madison, Casey, Estill, Lincoln, Powell, and Garrard
Counties, Kentucky.
3 Special permit segment 6 does not meet Condition 1(b), it has no identified test person or pressure test elevations
and was tested in 1964.
4 CGT has not furnished chemical and mechanical properties for the pipe in special permit segments 1 through 7.
5 If the special permit inspection area footage does not extend from launcher to receiver, then the special permit
inspection area would need to be extended.
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 3 of 12

<<<PAGE 4>>>

Public Notice:
On August 17, 2022, PHMSA posted a notice of this special permit request in the Federal Register
(87 FR 50693) with a closing date of September 16, 2022. PHMSA received one public comment
concerning this special permit. This public comment is reviewed in the Final Environmental
Assessment (FEA) and Finding of No Significant Impact (FONSI).
The CGT special permit application letter, Federal Register notice, Special Permit, FEA and
FONSI, and all other pertinent documents are available for review in Docket No. PHMSA-2022-
0084 in the Federal Docket Management System (FDMS) located on the internet at
www.Regulations.gov.
Analysis:
Background: On June 29, 2004, PHMSA published in the Federal Register (69 FR 38948) the
criteria it uses for the consideration of applications for class location change waivers, now being
granted or denied through a special permit. First, certain threshold requirements should be met on
a pipeline special permit segment for a class location change special permit to be granted. Second,
the age and manufacturing process of the pipe; system design, and construction; environmental,
operating, and maintenance histories; and integrity management program elements are evaluated as
significant criteria. These significant criteria are presented in matrix form and can be reviewed in
the FDMS, Docket No. PHMSA–RSPA-2004-17401. Third, special permits will only be granted
when pipe conditions and active integrity management provides a level of safety greater than or
equal to a pipe replacement or pressure reduction. The operator’s federal pipeline safety regulation
compliance history is also evaluated as part of the criteria matrix for acceptability prior to issuance
of a special permit.
Threshold Requirements: Each of the threshold requirements published by PHMSA in the June
29, 2004, Federal Register notice is discussed below for the CGT special permit request.
1) No pipeline segments in a class location changing to Class 4 location will be considered.
• This special permit request is for special permit segments on the CGT 30-inch diameter
ML 100 and ML 200 pipelines and the 36-inch ML 300 pipeline, where a change has
occurred from a Class 1 location to a Class 3 location.
• CGT meets this requirement.
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 4 of 12

<<<PAGE 5>>>

2) No bare pipe will be considered.
• The CGT special permit segments are externally coated with coal tar enamel.
• CGT has not reported any coating issues such as disbonded coating.
• CGT meets this requirement.
3) No pipe containing wrinkle bends will be considered.
• There are no wrinkle bends in the special permit segments.
• CGT meets this requirement.
4) No pipe segments operating above 72% of the specified minimum yield strength (SMYS) will
be considered for a Class 3 special permit.
• The special permit segments operate at or below 72% SMYS.
• CGT meets this requirement.
5) Records must be produced that show a hydrostatic test to at least 1.25 x MAOP and 90% of
SMYS.
• The special permit segments on the CGT 30-inch diameter ML 100 and ML 200
pipelines and the 36-inch ML 300 pipeline were tested to at least 1.25 times the MAOP
or Table 1 and Condition 1(b) will require a pressure test to 1.39 times MAOP.
• CGT meets or will meet this requirement.
6) Inline inspection (ILI) must have been performed with no significant anomalies identified that
indicate systemic problems such as stress corrosion cracking (SCC).
• CGT has run ILI tools on the CGT 30-inch diameter ML 100 and ML 200 pipelines and
the 36-inch ML 300 pipeline in 2015, 2016, 2019, and 2020 in the special permit
inspection area. Attachment A - Listing of Columbia Gulf Transmission (CGT)
Special Permit Segments details all ILI assessments and date of the assessment.
• CGT has found two (2) crack features at Survey Station 2346+82 on special permit
segments 3, 4, and 7. The cracks were minor surface cracks and have been remediated.
• CGT meets this requirement.
7) Criteria for consideration of a class location change waiver, being considered through the
special permit, published by PHMSA in the Federal Register (69 FR 38948), define a waiver
inspection area (special permit inspection area) as up to 25 miles of pipe on either side of the
waiver segment (special permit segment).
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 5 of 12

<<<PAGE 6>>>

• A special permit would be contingent upon CGT’s incorporation of the special permit
segments in its written integrity management program as covered segments in a high
consequence area (HCA) in accordance with 49 CFR 192.903 and to assess and
remediate threats to the special permit inspection area.
• CGT’s defined special permit inspection areas 1, 2 and 3 are 63.72, 79.92, and 80.04
miles in length as detailed in Table 3 – Special Permit Inspection Areas.
Criteria Matrix: The data submitted by CGT for the special permit segments has been compared
to the class location change special permit criteria matrix. The data fall within the probable
acceptance or the possible acceptance column of the criteria matrix, except for PHMSA
enforcement findings which fall under the requires substantial justification.
• The special permit segments fall in the probable acceptance column of the criteria
matrix for:
o Design stress, pipe material, depth of pipe cover, test pressure, test failures, type
service, pressure fluctuations, safety related conditions, leaks and failures, direct
assessment, ILI type, ILI program, and damage prevention program.
• The special permit segments fall in the possible acceptance column of the criteria matrix
for:
o Class 1 to 3 location, pipe manufacturer, pipe coating type (may shield cathodic
protection (CP)), local geology, CP, and HCA program.
• The special permit segments fall in the requires substantial justification column of the
criteria matrix for:
o CGT has identified issues in girth welds within the special permit segments and
pipe girth weld records are not available. CGT will complete Special Permit
Condition 6 – Girth Welds;
o The coating type may shield CP when disbonded, causing SCC.
6 CGT will
complete Special Permit Condition 7 – Stress Corrosion Cracking Threat; and
6 Two (2) types of SCC are found on pipelines: High pH (9 to 11) SCC and near-neutral pH (6 to 8) SCC. Coal tar
and asphalt coatings that are disbonded are more prone to having SCC.
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 6 of 12

<<<PAGE 7>>>

o Inspection findings (Enforcement History) – PHMSA enforcements are in the “Past
Enforcement History – January 1, 2011 through September 30, 2022” section
below.
Operational Integrity Compliance:
To inform PHMSA’s decision about whether a special permit could provide a level of safety
greater than or equal to a pipe replacement or pressure reduction and is consistent with pipeline
safety, PHMSA reviewed this special permit request to understand the known type of integrity
threats that are in the special permit segments and special permit inspection area. This integrity
information was used to design special permit conditions to provide a systematic program to
review and remediate the pipeline for safety concerns. Additional operational integrity review and
remediation requirements are required by this special permit to ensure that the operator has an
ongoing program to locate and remediate safety threats. These threats to integrity and safety
include any issues with the pipe coating quality, CP effectiveness, operations damage prevention
program, pipe depth of soil cover, weld seam and girth weld integrity, anomalies in the pipe steel
and welds, and material and structures either along or near the pipeline that could cause the CP
system to be ineffective. PHMSA has carefully designed a comprehensive set of conditions that
CGT must implement to comply with this special permit.
Past Enforcement History – January 1, 2011 through September 30, 2022:
From January 1, 2011, through September 30, 2022, CGT was cited in five (5) enforcement actions
with a total of $33,100 in assessed civil penalties. PHMSA initiated one (1) Corrective Action
Order, one (1) Notice of Amendment, two (2) Notices of Probable Violation, no Safety Orders, and
one (1) Warning Letter against CGT. TC Energy acquired CGT in 2016. Since TC Energy
became owner of CGT, PHMSA has issued no enforcement cases.
Tables 4 and 5 below show PHMSA enforcement actions and civil penalties for CGT:
Table 4: CGT Enforcement Matters from January 1, 2011, through September 30, 2022
Notice of
Status Corrective
Action Order
Notice of
Safety
Probable
Amendment
Order
Warning
Letter Total
Violation
CLOSED 1 1 2 0 1 5
OPEN 0 0 0 0 0 0
Total 1 1 2 0 1 5
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 7 of 12

<<<PAGE 8>>>

Table 5: CGT Enforcement Civil Penalty Status
January 1, 2011 through September 30, 2022
Proposed Awaiting
Order Assessed Withdrawn/Reduced Collected
$33,100 $0 $0 $33,100
$33,100 Summary of Enforcement Findings for CGT includes:
• Construction: Atmospheric Corrosion Control: Monitoring; External Corrosion Control:
Cathodic Protection and Electrical Isolation; Internal Corrosion Control: Inspection Internal
Surface; Design: Yield Strength for Steel Pipe; Maintenance: Abandonment or Deactivation
of Facilities, Pressure Limiting and Regulating Station-Relief Devices, Repair Procedures;
Operations: Emergency Plans, Underwater Inspection to Identify Gulf of Mexico Pipeline
Hazards; Operator Qualification: Qualification Program; Reporting: System Incident
Reports, National Registry of Pipeline and LNG Operators; Welding: Qualification of
Welders.
• 49 CFR 191.22, 191.5, 192.107, 192.227, 192.463, 192.467, 192.475, 192.481, 192.612,
192.615, 192.711, 192.727, 192.743, and 192.805.
Table 6 below shows PHMSA’s enforcement actions and civil penalties for CGT and the specific 49
CFR Parts 191 and 192 violations:
Table 6: Summary of Enforcement Findings from CGT
January 1, 2011 to September 30, 2022
Notice of Amendment
Corrosion Control 5 Design 1 Operation and/or Maintenance 5
Operator Qualification 3 Welding of Steel in Pipelines 1
Notice of Amendment Total: 15
Notice of Probable Violation
Operation and/or Maintenance 1 Reporting 1
Notice of Probable Violation Total: 2
Warning Letter
Reporting 2
Warning Letter Total: 2
Grand Total: 19
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 8 of 12

<<<PAGE 9>>>

From January 1, 2011, through September 30, 2022, PHMSA initiated the enforcement cases
outlined in Tables 7 and 8 against the four (4) pipeline companies owned by TC Energy, the
operator of CGT. TC Energy owns and operates the ANR Pipeline Company (ANR), Columbia
Gas Transmission, LLC (TCO), Columbia Gulf Transmission, LLC (CGT), and Great Lakes Gas
Transmission Company (GLGT) pipeline systems (Operator identification #s 405, 2616, 2620, and
6660). TC Energy acquired the TCO and CGT pipeline systems in 2016.
Table 7: Enforcement Matters from January 1, 2011 through September 30, 2022
ANR, TCO, CGT, and GLGT
Notice of
Status Corrective
Action Order
Notice of
Safety
Probable
Amendment
Order
Warning
Letter Total
Violation
CLOSED 3 19 27 3 27 79
OPEN 0 0 2 0 0 2
Total 3 19 29 3 27 81
Table 8: Enforcement Civil Penalty Status for ANR, TCO, CGT, and GLGT
January 1, 2011 through September 30, 2022
Proposed Awaiting
Order Assessed Withdrawn/Reduced Collected
$3,364,004 $0 $3,160,404 $177,200 $3,160,404
The type of 49 CFR Part 192 enforcement violations against TC Energy on these four (4) pipeline
systems from January 1, 2011 through September 30, 2022 includes: Construction: Compliance
with specifications or standards and General Inspection; Control Room Management: Alarm
Management, Fatigue Mitigation, Roles & Responsibilities, SCADA System Limitations, and
Training; Atmospheric Corrosion Control: General and Monitoring; Corrosion Control:
Corrosion Control Records and CP after installation within one year; External Corrosion
Control: Buried Pipe Post 1971, CP, Electrical Isolation, Interference Currents, Monitoring, and
Test Leads; Internal Corrosion Control: Inspection internal surface and Monitoring; Design:
Compressor Station Design & Construction, Compressor Stations Additional Safety Equipment,
Compressor Stations Emergency Shutdown, Supports and Anchors, Yield Strength for Steel Pipe;
Drug and Alcohol: Alcohol Tests Required and Drug Testing Required; Enforcement
Procedures: Inspections and Investigations, Integrity Management (IM): Addressing Integrity
Issues, Change to IM Plan, Elements and Implementation, HCA Identification, Preventative and
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 9 of 12

<<<PAGE 10>>>

Mitigative Measures, Program Elements, and Requirements for SCC Direct Assessment (SCCDA);
OME Procedural Manual: General, Maintenance and normal operations, and Safety Related
Condition Report (SRCR); Maintenance: Abandonment or Deactivation of Facilities, Compressor
Stations-Gas Detection, Compressor stations-inspection and testing of relief devices, Compressor
stations-Storage of Combustible Materials, General, Line Markers, Pressure Limiting and
Regulating Stations-Inspection and Testing, Pressure Limiting and Regulating Stations-Relief
Devices, Prevention of Accidental Ignition, Procedures, Remedial Measures, Patrolling, Record
keeping, Repair Procedures, and Valve Maintenance Transmission Lines; Operations: Change in
Class Location (Required Study), Emergency Plans, General, MAOP-Steel or Plastic, Odorization
of Gas, Procedures, Transfer Procedures, and Underwater Inspection to Identify Gulf of Mexico
Pipeline Hazards; Operator Qualification: Qualification Program; Public Awareness: Activities
for advising affected municipalities, Comprehensive Media, Develop and Implement Public
Awareness, Justification for not following API RP 1162, Specifics addressing the Public;
Reporting: Filing SRCR, Annual Reports, Systems Incident Reports, Immediate Reporting
Incident, National Registry of Pipeline and LNG Operators, and SRCR; Test Requirements:
General; Gas Transportation: Class Locations, Gathering Line Requirements, Underground
Natural Gas Storage Facilities; Welding: Inspection and Test of Welds, Procedures, and
Qualification of Welders,
• 49 CFR 191.15, 191.17, 191.22, 191.23, 191.25, 191.5, 192.107, 192.12, 192.161, 192.163,
192.167, 192.171, 192.201, 192.225, 192.227, 192.241, 192.303, 192.305, 192.309,
192.319, 192.455, 192.463, 192.465, 192.467, 192.471, 192.473, 192.475, 192.477,
192.479, 192.481, 192.491, 192.503, 192.505, 192.603, 192.605, 192.609, 192.612,
192.615, 192.616, 192.619, 192.620, 192.625, 192.631, 192.703, 192.705, 192.707,
192.709, 192.711, 192.727, 192.731, 192.735, 192.736, 192.739, 192.743, 192.745,
192.751, 192.805, 192.905, 192.907, 192.909, 192.911, 192.929, 192.933, 192.935, and
192.949.
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 10 of 12

<<<PAGE 11>>>

Table 9 below gives a complete summary of the findings and the specific 49 CFR Parts 191 and 192
violations:
Table 9: Summary of Enforcement Findings for ANR, TCO, CGT, and GLGT
January 1, 2011 through September 30, 2022
Notice of Amendment
Construction 1 Control Room Management 14 Corrosion Control 5
Design 1 Integrity Management 5 OME Procedural Manual 10
Operation and/or Maintenance 13 Operator Qualification 5 Public Awareness 6
Transportation of Gas 10 Welding of Steel in Pipelines 2
Notice of Amendment Total: 72
Notice of Probable Violation
Construction 2 Corrosion Control 12 Design 3
Drug and Alcohol 2 Integrity Management 6 OME Procedural Manual 6
Operation and/or Maintenance 18 Public Awareness 1 OME Procedural Manual 10
Operation and/or Maintenance 26 Reporting 11 Test Requirements 1
Transportation of Gas 1 Welding of Steel in Pipelines 1
Notice of Probable Violation Total: 100
Warning Letter
Control Room Management 5 Corrosion Control 5 Design 2
Enforcement and Regulatory
Procedures 1 Integrity Management 2 OME Procedural Manual 10
Operation and/or Maintenance 23 Operator Qualification 1 Reporting 9
Transportation of Gas 5 Welding of Steel in Pipelines 1
Warning Letter Total: 64
Grand Total: 236
Findings:
Based on the information submitted by CGT and PHMSA’s analysis of the technical, operational,
and safety issues, PHMSA finds that granting this special permit to CGT to operate special permit
segments on the 30-inch diameter ML 100 and ML 200 and 36-inch diameter ML 300 Pipelines
located in Madison County, Kentucky is consistent with pipeline safety.
PHMSA has designed special permit conditions to effectively assess and remediate threats to the
special permit segments and special permit inspection area, including assessments to evaluate
pipe girth welds that have not been non-destructively tested and for the cracking threat. To ensure
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 11 of 12

<<<PAGE 12>>>

CGT properly implements the special permit conditions, CGT will be required to give PHMSA an
annual review of their compliance with the special permit.
PHMSA finds that no significant negative impact to human safety and the environment will result
from the issuance and full implementation of a special permit that waives the requirements of 49
CFR 192.611 for class location changes from Class 1 to a Class 3 location. This permit requires
CGT to implement the special permit conditions that include safety requirements on the
operations, maintenance, and integrity management of the special permit segments and the special
permit inspection area.
Completed in Washington DC on: June 30, 2023
Prepared by: PHMSA - Engineering and Research Division
Final Page of the Special Permit Analysis and Findings
PHMSA-2022-0084 – Columbia Gulf Transmission, LLC Special Permit Analysis and Findings – Kentucky
Page 12 of 12
- **truncated:** false
- **body characters:** 24086