# 2010 IN NG Program Evaluation - in2010ngprogramevaluation (Indiana; Natural Gas State Program Evaluation)

- **operation:** document
- **citation:** PHMSA in2010ngprogramevaluation
- **title:** 2010 IN NG Program Evaluation - in2010ngprogramevaluation (Indiana; Natural Gas State Program Evaluation)
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-01-01
- **effective on:** Not available
- **summary:** 2010 PHMSA natural gas program evaluation for Indiana.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-state-evaluation-in-ng-program-evaluation-in2010ngprogramevaluation.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-state-evaluation-in-ng-program-evaluation-in2010ngprogramevaluation.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-state-evaluation-in-ng-program-evaluation-in2010ngprogramevaluation
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/subdoc/576/in2010ngprogramevaluation.pdf
**body:**

1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2010 Natural Gas State Program Evaluation for INDIANA UTILITY REGULATORY COMMISSION Document Legend PART: O -- Representative Date and Title Information A -- General Program Qualifications B -- Inspections and Compliance - Procedures/Records/Performance C -- Interstate Agent States D -- Incident Investigations E -- Damage Prevention Initiatives F -- Field Inspection G -- PHMSA Initiatives - Strategic Plan H -- Miscellaneous I -- Program Initiatives DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 1

2010 Natural Gas State Program Evaluation -- CY 2010 Natural Gas State Agency: Indiana Rating: Agency Status: Date of Visit: 06/06/2011 - 06/10/2011 Agency Representative: William Boyd PHMSA Representative: Leonard Steiner Commission Chairman to whom follow up letter is to be sent: Name/Title: James D. Atterholt, Chairman Agency: Indiana Utility Regulatory Commission Address: 101 West Washington Street, Suite 1500E City/State/Zip: Indianapolis, IN 46204 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2010 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual certification/agreement attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART F): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART F, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A General Program Qualifications 26 26 B Inspections and Compliance - Procedures/Records/Performance 23.5 23.5 C Interstate Agent States 0 0 D Incident Investigations 6 6 E Damage Prevention Initiatives 9 9 F Field Inspection 12 12 G PHMSA Initiatives - Strategic Plan 9 9 H Miscellaneous 3 3 I Program Initiatives 6 6 TOTALS 94.5 94.5 State Rating................................................................................................................................................... 100.0 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 2

PART A - General Program Qualifications Points(MAX) Score 1 Did the state submit complete and accurate information on the attachments to its most current 60105(a) Certification/60106 (a) Agreement? (NOTE: PHMSA Representative to verify certification/agreement attachments by reviewing appropriate state documentation. Score a deficiency in any one area as "needs improvement". Attachment numbers appear in parenthesis) Previous Question A.1, Items a-h worth 1 point each Yes = 8 No = 0 Needs Minor Improvement = 3-7 Needs Major Improvement = 2 a. State Jurisdiction and agent status over gas facilities (1) b. Total state inspection activity (2) c. Gas facilities subject to state safety jurisdiction (3) d. Gas pipeline incidents (4) e. State compliance actions (5) f. State record maintenance and reporting (6) g. State employees directly involved in the gas pipeline safety program (7) h. State compliance with Federal requirements (8) 8 8 SLR Notes: 2 Did the state have an adequate mechanism to receive operator reporting of incidents to ensure state compliance with 60105(a) Certification/60106(a) Agreement requirements (fatality, injury requiring hospitalization, property damage exceeding $50,000 - Mechanism should include receiving "after hours" reports)? (Chapter 6) Previous Question A.2 Yes = 1 No = 0 1 1 SLR Notes: 3 Has the state held a pipeline safety TQ seminar(s) in the last 3 years? (NOTE: Indicate date of last seminar or if state requested seminar, but T&Q could not provide, indicate date of state request for seminar. Seminars must be held at least once every 3 calendar years.) (Chapter 8.5) Previous Question A.4 Yes = 2 No = 0 SLR Notes: Yes, in July 2010 2 2 4 Were pipeline safety program files well-organized and accessible?(NOTE: This also includes electronic files) (Chapter 5) Previous Question A.5 Yes = 1 No = 0 SLR Notes: Yes 1 1 5 Did state records and discussions with the state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? (Chapter 4.1, Chapter 8.1) Previous Question A.6 Yes = 2 No = 0 Needs Improvement = 1 SLR Notes: Yes 2 2 6 Did the state respond in writing within 60 days to the requested items in the Chairman's letter following the Region's last program evaluation? (No response is necessary if no items are requested in letter and mark "Yes") (Chapter 8.1) Previous Question A.8 Yes = 1 No = 0 1 1 SLR Notes: Yes 7 What actions, if necessary, did the State initiate as a result of issues raised in the Chairperson's letter from the previous year? Did actions correct or address deficiencies from previous year's evaluation? (No response is necessary if no items are requested in letter and mark "Yes") (Chapter 8.1) Previous Question A.8/A.9 Yes = 1 No = 0 DUNS: 086329518 2010 Natural Gas State Program Evaluation 1 1 Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 3

SLR Notes: It was recommended that Indiana move towards more electronic files and to provide enough storage space and security for these files. The Chairman is having the pipeline safety division move to more electronic files and has plans for the future. Personnel and Qualifications 8 Has each inspector fulfilled the 3 year TQ training requirement? If No, has the state been granted a waiver regarding TQ courses by the Associate Administrator for Pipeline Safety? (NOTE: If the State has new inspectors who have not attended all TQ courses, but are in a program which will achieve the completion of all applicable courses within 3 years of taking first course (5 years to sucessfully complete), or if a waiver has been granted by the applicable Region Director for the state, please answer yes.) (Chapter 4.4) Previous Question A.10 Yes = 3 No = 0 3 3 SLR Notes: Yes, All inspectors have either completed the required course or are on a schedule to complete. 9 Brief Description of Non-TQ training Activities: Info Only = No Points For State Personnel: Purdue Corrosion Short course For Operators: Indiana conducts a master meter seminar For Non-Operator Entities/Parties, Information Dissemination, Public Meetings: 1 inspector is on a Regional CGA Board. Info Only Info Only SLR Notes: 10 SLR Notes: Yes Did the lead inspectors complete all required T&Q OQ courses and Computer Based Training (CBT) before conducting OQ Inspections? (Chapter 4.4.1) Previous Question A.12 Yes = 1 No = 0 1 1 11 Did the lead inspectors complete all required TQ Integrity Management (IMP) Courses/Seminars and CBT before conducting IMP Inspections? (Chapter 4.4.1) Previous Question A.13 Yes = 1 No = 0 SLR Notes: Three inspectors are on schedule to complete the required courses 1 1 12 Was the ratio acceptable of Total inspection Person-days to Total Person-days charged to the program by state inspectors? (Region Director may modify points for just cause) (Chapter 4.3) Previous Question B.12 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 733.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 6.67 = 1466.67 Ratio: A / B 733.00 / 1466.67 = 0.50 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 5 5 SLR Notes: YES 13 SLR Notes: Have there been modifications or proposed changes to inspector-staffing levels? (If yes, describe) Previous Question B.13 Info Only = No Points Info Only Info Only DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 4

No plans to modify the authorized staffing levels. 14 Part-A General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: Total points scored for this section: 26 Total possible points for this section: 26 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 5

PART B - Inspections and Compliance - Procedures/Records/ Performance Points(MAX) Score Inspection Procedures 1 Does the State have a written inspection plan to complete the following? (all types of operators including LNG) (Chapter 5.1) Previous Question B.1 + Chapter 5 Changes + Incorporate LNG Yes = 6.5 No = 0 Needs Improvement = 50% Deduction a Standard Inspections (Including LNG) (Max points = 2) b IMP Inspections (Including DIMP) (Max points = .5) c OQ Inspections (Max points = .5) d Damage Prevention (Max points = .5) e On-Site Operator Training (Max points = .5) f Construction Inspections (Max points = .5) g Incident/Accident Investigations (Max points = 1) h Compliance Follow-up (Max points = 1) SLR Notes: 6.5 6.5 Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement 2 Did the written Procedures for selecting operators adequately address key concerns? (Chapter 5.1) Previous 2 2 Question B.2, items a-d are worth .5 point each Yes = 2 No = 0 Needs Improvement = 50% Deduction a Length of time since last inspection Yes No Needs Improvement b History of Operator/unit and/or location (including leakage , incident and compliance history) Yes No Needs Improvement c Type of activity being undertaken by operator (construction etc) Yes No Needs Improvement d For large operators, rotation of locations inspected Yes No Needs Improvement SLR Notes: Inspection Performance 3 Did the state inspect all types of operators and inspection units in accordance with time intervals established in its written procedures? (Chapter 5.1) Previous Question B.3 Yes = 2 No = 0 SLR Notes: Yes 2 2 4 Did the state inspection form cover all applicable code requirements addressed on the Federal Inspection forms? (Chapter 5.1 (3)) Previous Question B.4 Yes = 1 No = 0 SLR Notes: Yes 1 1 5 Did state complete all applicable portions of inspection forms? (Chapter 5.1 (3)) Previous Question B.5 Yes = 1 No = 0 SLR Notes: Yes 1 1 6 Did the state initiate appropriate follow-up actions to Safety Related Condition Reports? (Chapter 6.3) Previous Question B.6 Yes = .5 No = 0 SLR Notes: No Safety Related Conditon Reports were submitted. DUNS: 086329518 2010 Natural Gas State Program Evaluation .5 NA Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 6

7 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Previous Question B.7 Yes = .5 No = 0 SLR Notes: Yes .5 .5 8 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Previous Question B.8 Yes = .5 No = 0 SLR Notes: .5 .5 9 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Previous Question B.9 Yes = .5 No = 0 .5 .5 SLR Notes: 10 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? (NTSB) Previous Question B.10 Yes = 1 No = 0 1 1 SLR Notes: Compliance - 60105(a) States Did the state adequately document sufficient information on probable violations? (Chapter 5.2) Previous Question B.14 Yes = 1 No = 0 Needs Improvement = .5 11 SLR Notes: Yes 1 1 12 SLR Notes: Does the state have written procedures to identify the steps to be taken from the discovery to the resolution of a probable violation as specified in the "Guidelines for State Participating in the Pipeline Safety Program"? (Chapter 5.1) Previous Question D(1).1 Yes = 1 No = 0 Needs Improvement = .5 1 1 13 Does the state have written procedures to notify an operator when a noncompliance is identified as specified in the "Guidelines for States Participating in the Pipeline Safety Program"? (Chapter 5.1(4)) Previous Question D (1).2 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: Yes, all probable noncompliances are sent to the operator. 1 1 14 Does the state have a written procedure for routinely reviewing the progress of compliance actions to prevent delays or breakdowns of the enforcement process, as required by the "Guidelines for States Participating in the Pipeline Safety Program"? (Chapter 5.1(5)) Previous Question D(1).3 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: Yes, Inspectors review open probably noncompliances every 90 days. 1 1 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 7

15 Has the State issued compliance actions for all probable violations discovered? (Note : PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation) Previous Question D(1).4 Yes = 1 No = 0 SLR Notes: Yes 1 1 16 SLR Notes: Yes Did the state follow its written procedures for reviewing compliance actions and follow-up to determine that prompt corrective actions were taken by operators, within the time frames established by the procedures and compliance correspondence, as required by the "Guidelines for States Participating in the Pipeline Safety Program"? Previous Question D(1).5 Yes = 1 No = 0 Needs Improvement = .5 1 1 17 If compliance could not be established by other means, did state pipeline safety program staff request formal action, such as a "Show Cause Hearing" to correct pipeline safety violations? (check each states enforcement procedures) Previous Question D(1).6 No = 0 Yes = 1 SLR Notes: No "Show Cause" hearings were required. 1 NA 18 SLR Notes: Yes Did the state adequately document the resolution of probable violations? (Chapter 5.1 (6)) Previous Question D(1).7 Yes = 1 No = 0 Needs Improvement = .5 1 1 19 SLR Notes: Yes Were compliance actions sent to a company officer? (manager or board member if municipal/government system) (Chapter 5.1(4)) Previous Question D(1).8 Yes = .5 No = 0 .5 .5 20 SLR Notes: Yes Did the compliance proceedings give reasonable due process to all parties? (check each states enforcement procedures) Previous Question D(1).9 Yes = 1 No = 0 Needs Improvement = .5 1 1 Compliance - 60106(a) States 21 Did the state use the current federal inspection form(s)? Previous Question D(2).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: 1 NA 22 SLR Notes: Are results adequately documented demonstrating inspection units were reviewed in accordance with state inspection plan? Previous Question D(2).2 Yes = 1 No = 0 Needs Improvement = .5 1 NA 23 SLR Notes: Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Previous Question D(2).3 Yes = 1 No = 0 Needs Improvement = .5 1 NA DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 8

24 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Previous Question D(2).4 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 25 Did the state give written notice to PHMSA within 60 days of all probable violations found? Previous Question D(2).5 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 26 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Previous Question D(2).6 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 27 Is the program manager familiar with state process for imposing civil penalties? Were civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Info Only = No Points Info Only NA SLR Notes: 28 Part B: General Comments/Regional Observations Info Only = No Points Info Only NA SLR Notes: Total points scored for this section: 23.5 Total possible points for this section: 23.5 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 9

PART C - Interstate Agent States Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Previous Question D(3).1 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 2 Are results documented demonstrating inspection units were reviewed in accordance with "PHMSA directed inspection plan"? Previous Question D(3).2 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Previous Question D(3).3 Yes = 1 No = 0 1 NA SLR Notes: 4 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Previous Question D(3).4 Yes = 1 No = 0 1 NA SLR Notes: 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Previous Question D(3).5 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Previous Question D(3).6 Yes = 1 No = 0 SLR Notes: 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Previous Question D(3).7 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: 8 Part C: General Comments/Regional Observations Info Only = No Points SLR Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 10

PART D - Incident Investigations Points(MAX) Score 1 Are state personnel following the procedures for Federal/State cooperation in case of an incident? (See Appendix in "Guidelines for States Participating in the Pipeline Safety Program") (Chapter 6.1) Previous Question E.1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: Yes 1 1 2 Are state personnel familiar with the jurisdictional authority and Memorandum of Understanding between NTSB and PHMSA? (See Appendix in "Guidelines for States Participating in the Pipeline Safety Program") (Chapter 6 ? Appendix D) Previous Question E.2 Yes = .5 No = 0 SLR Notes: .5 .5 3 Did the state keep adequate records of incident notifications received? Previous Question E.3 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: Yes 1 1 4 If an onsite investigation of an incident was not made, did the state obtain sufficient information by other means to determine the facts and support the decision not to go on-site? Previous Question E.4 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: Yes, Have criteria when they will not condcut on-site investigation. 1 1 5 Were investigations thorough and conclusions and recommendations documented in an acceptable manner? Previous Question E.5, comprehensive question worth 2 points total Yes = 2 No = 0 Needs Improvement = 1 a. Observations and Document Review b. Contributing Factors c. Recommendations to prevent recurrences where appropriate 2 2 Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement SLR Notes: 6 Did the state initiate enforcement action for violations found during any incident investigation(s)? Previous Question E.6 Variation Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: No probable violatons were discovered at an incident scene. 1 NA 7 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate annual report data from operators concerning incidents/accidents and investigate discrepancies) (Chapter 6) Previous Question E.7/E.8 Yes = .5 No = 0 SLR Notes: Yes .5 0.5 8 Part D: General Comments/Regional Observations Info Only = No Points SLR Notes: Info Only Info Only DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 11

Total points scored for this section: 6 Total possible points for this section: 6 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 12

PART E - Damage Prevention Initiatives Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? Previous Question B.11 Yes = 2 No = 0 Needs Improvement = 1 2 2 SLR Notes: Yes, this is inspected and documented on the standard inspection form. 2 Did the state inspector check to assure the pipeline operator is following its written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? New 2008 Yes = 2 No = 0 2 2 SLR Notes: Yes 3 Did the state encourage and promote the adoption of the Common Ground Alliance Best Practices document to its regulated companies as a means of reducing damages to all underground facilities? Previous Question A.7 Yes = 2 No = 0 Needs Improvement = 1 2 2 SLR Notes: Indiana promotes CGA Best Practices at the seminars, excavators training sessions and Regional Damage Preventation Council meetings. 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? New 2008 Yes = 1 No = 0 1 1 SLR Notes: Yes 5 Did the state review operators' records of accidents and failures due to excavation damage to ensure causes of failure are addressed to minimize the possibility of recurrence as required by 192.617? Yes = 2 No = 0 2 2 SLR Notes: Yes 6 Part E: General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: Total points scored for this section: 9 Total possible points for this section: 9 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 13

PART F - Field Inspection Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: City of Pittsboro, (USDI) Name of State Inspector(s) Observed: John McLaughlin Location of Inspection: Pittsboro, Indiana Date of Inspection: 6/8/2011 Name of PHMSA Representative: Leonard Steiner Info Only Info Only SLR Notes: 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? New 2008 Yes = 1 No = 0 SLR Notes: Yes 1 1 3 Did the inspector use an acceptable inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Previous Question F.2 Yes = 2 No = 0 2 2 SLR Notes: 4 Did the inspector thoroughly document results of the inspection? Previous Question F.3 Yes = 2 No = 0 SLR Notes: The inspector entered the results of the questions onto a form on his computer. 2 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps, pyrometer, soap spray, CGI, etc.) New 2008 Yes = 1 No = 0 SLR Notes: Yes 1 1 6 What type of inspection(s) did the state inspector conduct during the field portion of the state evaluation? (i.e. Standard, Construction, IMP, etc) New 2008 Info Only = No Points SLR Notes: Standard inspection Info Only Info Only 7 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) New 2008, comprehensive question worth 2 points total Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities/Facilities d. Other (Please Comment) 2 2 SLR Notes: DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 14

8 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Liaison will document reasons if unacceptable) Previous Question F.8 Yes = 2 No = 0 2 2 SLR Notes: yes, Very knowledgable. 9 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) Previous Question F.10 Yes = 1 No = 0 1 1 SLR Notes: Yes 10 During the exit interview, did the inspector identify probable violations found during the inspections? Previous Question F.11 Yes = 1 No = 0 SLR Notes: Yes, Mr. Mclaughlin found two probably non compliances. 1 1 11 What did the inspector observe in the field? (Narrative description of field observations and how inspector Info Only Info Only performed) Info Only = No Points SLR Notes: On June 8, 2011, I observed John McLaughlin, pipeline safety inspector for the Indiana Utility Regulatory Commission conduct a standard inspection. The operator was the Town of Pittsboro, Indiana. The type of system was a distribution system. I was accompanied by the Assistant Director of Pipeline Safety, Michael Orr. Mr. McLaughlin arrived at the office at the perdetermined time. He had prepared for this inspection and started on time. The inspection was conducted in a smooth and planned procedure. Mr. McLaughlin was courteous and professional. 12 Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) Info Only Info Only Info Only = No Points SLR Notes: None noted 13 Field Observation Areas Observed (check all that apply) Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe Info Only Info Only DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 15

s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance E. Vault Maintenance F. Welding G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other SLR Notes: 14 Part F: General Comments/Regional Observations Info Only = No Points SLR Notes: DUNS: 086329518 2010 Natural Gas State Program Evaluation Info Only Info Only Total points scored for this section: 12 Total possible points for this section: 12 Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 16

PART G - PHMSA Initiatives - Strategic Plan Points(MAX) Score Risk base Inspections - Targeting High Risk Areas 1 Does state have process to identify high risk inspection units? Yes = 1.5 No = 0 Risk Factors (criteria) to consider may include: Miles of HCA's, Geographic area, Population Density Length of time since last inspection History of Individual Operator units (leakage, incident and compliance history, etc.) Threats - (Excavation Damage, Corrosion, Natural Forces, Other Outside Forces, Material or Welds, Equipment, Operations, Other) 1.5 1.5 SLR Notes: 2 Are inspection units broken down appropriately? (see definitions in Guidelines) Yes = .5 No = 0 SLR Notes: Yes .5 0.5 3 Consideration of operators DIMP Plan? (if available and pending rulemaking) Info Only = No Points SLR Notes: Indiana needs to develop the procedures to inspect DIMP requirements. Info Only Info Only 4 Does state inspection process target high risk areas? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 Use of Data to Help Drive Program Priority and Inspections 5 Does state use data to analyze effectiveness of damage prevention efforts in the state? (DIRT or other data, etc) .5 Yes = .5 No = 0 SLR Notes: All large operators submit the data into DIRT. Indiana uses this data to analyze the effectiveness of the pipeline safety program. 0.5 6 Has state reviewed data on Operator Annual reports for accuracy? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 7 Has state analyzed annual report data for trends and operator issues? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 8 Has state reviewed data on Incident/Accident reports for accuracy? Yes = .5 No = 0 SLR Notes: Yes, this is part of the incident investigation. .5 0.5 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 17

9 Does state do evaluation of effectiveness of program based on data? (i.e. performance measures, trends, etc.) Yes = .5 No = 0 SLR Notes: Indiana has 4 data points and will do a periodic analysis. .5 0.5 10 SLR Notes: Yes Did the State input all operator qualification inspection results into web based database provided by PHMSA in a timely manner upon completion of OQ inspections? Previous Question B.15 Yes = .5 No = 0 .5 0.5 11 Did the State submit their replies into the Integrity Management Database (IMDB) in response to the Operators notifications for their integrity management program? Previous Question B.16 Yes = .5 No = 0 SLR Notes: None required. .5 NA 12 Have the IMP Federal Protocol forms been uploaded to the IMDB? Previous Question B.17 Yes = .5 No = 0 SLR Notes: No IMP inspections conducted in CY 2010. .5 NA 13 SLR Notes: Yes Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? Previous Question B.18 Yes = .5 No = 0 .5 0.5 14 Has state confirmed transmission operators have submitted information into National Pipeline Mapping System (NPMS) database along with any changes made after original submission? Yes = .5 No = 0 SLR Notes: They have sent an advisory letter to operators of transmission pipelines, and will check at the next standard inspection. .5 0.5 Accident/Incident Investigation Learning and Sharing Lessons Learned 15 Has state shared lessons learned from incidents/accidents? (i.e. NAPSR meetings and communications) Yes = .5 No = 0 SLR Notes: Yes .5 0.5 16 Does the State support data gathering efforts concerning accidents? (Frequency/Consequence/etc) .5 0.5 Yes = .5 No = 0 SLR Notes: Yes 17 Does state have incident/accident criteria for conducting root cause analysis? Info Only = No Points SLR Notes: No, Indiana needs to develop criteria when root cause analysis investigation is conducted. Info Only Info Only 18 Does state conduct root cause analysis on incidents/accidents in state? Info Only = No Points DUNS: 086329518 2010 Natural Gas State Program Evaluation Info Only Info Only Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 18

SLR Notes: No 19 Has state participated on root cause analysis training? (can also be on wait list) Yes = .5 No = 0 .5 0.5 SLR Notes: Yes, The program manager has completed the training. Transparency - Communication with Stakeholders 20 Other than pipeline safety seminar does State communicate with stakeholders? (Communicate program data, pub awareness, etc.) Yes = .5 No = 0 .5 0.5 SLR Notes: Indiana assists the Excavator's meeting and with municipality boards. 21 Does state share enforcement data with public? (Website, newsletters, docket access, etc.) Yes = .5 No = 0 .5 0.5 SLR Notes: Indiana posts the number of probable violations discovered and the number of compliance action on the Indiana Commision website. 22 Part G: General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: Total points scored for this section: 9 Total possible points for this section: 9 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 19

PART H - Miscellaneous Points(MAX) Score 1 What were the major accomplishments for the year being evaluated? (Describe the accomplishments, NAPSR Activities and Participation, etc.) Yes = .5 No = 0 .5 0.5 SLR Notes: Indiana has established an advisory committee for violations by excavators. 2 What legislative or program initiatives are taking place/planned in the state, past, present, and future? (Describe initiatives (i.e. damage prevention, jurisdiction/authority, compliance/administrative, etc.) Yes = .5 No = 0 .5 0.5 SLR Notes: Indiana will initiate a database to track damages by excavators. They will assist to start a CGA Regional Council. 3 Any Risk Reduction Accomplishments/Projects? (i.e. Cast iron replacement projects,bare steel,third-party damage reductions, etc.) Yes = .5 No = 0 .5 0.5 SLR Notes: One operator has a cast iron, bare steel and unprotected steel replacement program. One municipal is being considered for a replacement program. 4 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? Yes = 1 No = 0 1 1 SLR Notes: Tes 5 Sharing Best Practices with Other States - (General Program) Yes = .5 No = 0 .5 0.5 SLR Notes: 6 Part H: General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: Total points scored for this section: 3 Total possible points for this section: 3 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 20

PART I - Program Initiatives Points(MAX) Score Drug and Alcohol Testing (49 CFR Part 199) 1 Has the state verified that operators have drug and alcohol testing programs? Yes = 1 No = 0 SLR Notes: Yes 1 1 2 Is the state verifying that operators are conducting the drug and alcohol tests required by the operators program (random, post-incident, etc.) Yes = .5 No = 0 SLR Notes: Yes .5 0.5 3 Is the state verifying that any positive tests are responded to in accordance with the operator's program? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 Qualification of Pipeline Personnel (49 CFR Part 192 Subpart N) 4 Has the state verified that operators have a written qualification program? Yes = 1 No = 0 SLR Notes: Yes, all OQ plans have been inspected at least once. 1 1 5 Has the state reviewed operator qualification programs for compliance with PHMSA rules and protocols? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 6 Is the state verifying that persons who perform covered tasks for the operator are qualified in accordance with the operator's program? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 7 Is the state verifying that persons who perform covered task for the operator are requalified at the intervals specified in the operator's program? Yes = .5 No = 0 SLR Notes: Yes .5 0.5 Gas Transmission Pipeline Integrity Management (49 CFR Part 192 Subpart O) 8 Has the state verified that all operators with transmission pipelines have either adopted an integrity management program (IMP), or have properly determined that one is not required? Yes = 1 No = 0 1 NA SLR Notes: No IM inspections coducted in CY 2010 9 Has the state verified that in determining whether a plan is required, the operator correctly calculated the potential impact radii and properly applied the definition of a high consequence area? Yes = .5 No = 0 SLR Notes: No IM inspections coducted in CY 2010 DUNS: 086329518 2010 Natural Gas State Program Evaluation .5 NA Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 21

10 Has the state reviewed operator IMPs for compliance with Subpart O? (In accordance with State Inspection plan) Yes = .5 No = 0 SLR Notes: No IM inspections coducted in CY 2010 .5 NA 11 Is the state monitoring operator progress on the inspections, tests and remedial actions required by the operator's IMP, including that they are being done in the manner and schedule called for in its IMP? Yes = .5 No = 0 SLR Notes: No IM inspections coducted in CY 2010 .5 NA 12 Is the state verifying that operators are periodically examining their transmission line routes for the appearance of new HCAs? Yes = .5 No = 0 SLR Notes: No IM inspections coducted in CY 2010 .5 NA Public Awareness (49 CFR Section 192.616) 13 Has the state verified that each operator has developed a continuing public awareness program? (due date was 6/20/06 for most operators, 6/20/07 for certain very small operators,6/13/08 for master meters) Yes = .5 No = 0 SLR Notes: Yes, This is part of a standard inspection .5 0.5 14 SLR Notes: es Has the state reviewed the content of these programs for compliance with 192.616 (by participating in the Clearinghouse or by other means)? Yes = .5 No = 0 .5 0.5 15 SLR Notes: Yes Is the state verifying that operators are conducting the public awareness activities called for in its program? Yes = .5 No = 0 .5 0.5 16 Is the state verifying that operators have evaluated their Public Awareness programs for effectiveness as described in RP1162? Info Only = No Points SLR Notes: No, the effectiveness will be inspected the next cycle of inspections. Info Only Info Only 17 Part I: General Comments/Regional Observations Info Only = No Points SLR Notes: Info Only Info Only Total points scored for this section: 6 Total possible points for this section: 6 DUNS: 086329518 2010 Natural Gas State Program Evaluation Indiana INDIANA UTILITY REGULATORY COMMISSION, Page: 22